Skip to Content

Notice

Notice of Application for Extension of Time To Commence and Complete Construction and Soliciting Comments, Motions To Intervene, and Protests

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble May 20, 2005.

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Application Type: Extension of Time to Commence and Complete Construction.

b. Project No: 11214-014.

c. Date Filed: March 25, 2005.

d. Applicant: City of Carlyle, Illinois (Applicant or Carlyle).

e. Name and Location of Project: The Carlyle Hydroelectric Project is to be located at the U.S. Army Corps of Engineers' Carlyle Dam on the Kaskaskia River near the City of Carlyle in Clinton County, Illinois.

f. Filed Pursuant to: Public Law 108-12.

g. Applicant Contact: Donald H. Clarke, Law Offices of GKRSE, 1500 K St., NW., Suite 330, Washington, DC 20005, (202) 408-5400.

h. FERC Contact: James Hunter, (202) 502-6086.

i. Deadline for filing comments, protests, and motions to intervene: June 20, 2005.

All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. The Commission strongly encourages electronic filings. Please include the project number (P-11214-014) on any comments or motions filed.

The Commission's Rules of Practice and Procedure require all interveners filing a document with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the documents on that resource agency.

j. Description of Application: Public Law 108-12 authorizes the Commission to extend the time during which the licensee is required to commence the construction of the project for three consecutive 2-year periods beyond June 26, 2001. The Applicant accordingly requests that the deadline for commencement of project construction be extended to July 25, 2007, and that the deadline for completion of construction also be extended.

k. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “FERRIS” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item g. above.

l. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

o. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

Start Signature

Linda Mitry,

Deputy Secretary.

End Signature End Preamble

[FR Doc. E5-2664 Filed 5-25-05; 8:45 am]

BILLING CODE 6717-01-P