Skip to Content

Notice

Stainless Steel Bar from India: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

SUMMARY:

The Department of Commerce is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on stainless steel bar from India. The period of review is February 1, 2004, through January 31, 2005. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended.

EFFECTIVE DATE:

October 18, 2005.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Scott Holland, AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington DC 20230; telephone (202) 482-1279.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On March 23, 2004, the Department of Commerce (“the Department”) published a notice of initiation of an administrative review of the antidumping duty order on stainless steel bar from India covering the period February 1, 2004, through January 31, 2005 (70 FR 14643). The preliminary results for this administrative review are currently due no later than October 31, 2005.

Extension of Time Limits for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an antidumping duty order for which a review is requested and issue the final results within 120 days after the date on which the preliminary results are published. However, if it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Due to the complexity of choosing the appropriate date of sale and the late initiation of a cost investigation, it is not practicable to complete the preliminary results of this review within the original time limit (i.e., October 31, 2005). Therefore, the Department is extending the time limit for completion of the preliminary results to no later than February 28, 2006, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: October 12, 2005.

Gary Taverman,

Acting Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E5-5738 Filed 10-17-05; 8:45 am]

BILLING CODE: 3510-DS-S