Skip to Content

Notice

Canned Pineapple Fruit From Thailand: Notice of Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: March 22, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Magd Zalok or Howard Smith, AD/CVD Operations, Office 4, Import Administration, International Trade Start Printed Page 14498Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone (202) 482-4162 or (202) 482-5193, respectively.

Background

On August 29, 2005, the Department of Commerce (the Department) published a notice of initiation of an administrative review of the antidumping duty order on canned pineapple fruit from Thailand, covering the period July 1, 2004, through June 30, 2005. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 70 FR 51009. The preliminary results of review are currently due no later than April 2, 2006.

Extension of Time Limit for Preliminary Results of Review

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the 245-day time limit for the preliminary determination to a maximum of 365 days and the time limit for the final determination to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.

We determine that it is not practicable to complete the preliminary results of this review within the original time limit because the review involves examining complex cost issues. Therefore, the Department is fully extending the time limit for completion of the preliminary results until no later than July 31, 2006, which is 365 days from the last day of the anniversary month of the date of publication of the order. The deadline for the final results of this administrative review continues to be 120 days after the publication of the preliminary results.

This notice is issued and published in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: March 16, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Further Info End Preamble

[FR Doc. 06-2787 Filed 3-21-06; 8:45 am]

BILLING CODE 3510-DS-M