Corrosion Resistant Carbon Steel Flat Products from Korea: Extension of Time Limits for the Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department ofCommerce.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Victoria Cho at (202) 482-5075, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW., Washington, DC 20230.

End Further Info

Background

On September 28, 2005, the U.S. Department of Commerce (“Department”) published a notice of initiation of the administrative review of the antidumping duty order on corrosion resistant carbon steel flat products from Korea, covering the period August 1, 2004 to July 31, 2005. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 70 FR 56631 (September 28, 2005). The preliminary results of this review are currently due no later than May 3, 2006.

Extension of Time Limit of Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested. Section 751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results by up to 120 days.

We determine that completion of the preliminary results of this review within the 245-day period is not practicable for the following reasons. This review covers six companies, and to conduct the sales and cost analyses for each requires the Department to gather and analyze a significant amount of information pertaining to each company's sales practices, manufacturing costs and corporate relationships. Given the number and complexity of issues in this case, and in accordance with section 751(a)(3)(A) of the Act, we are extending the time Start Printed Page 19873period for issuing the preliminary results of review by 100 days. Therefore, the preliminary results are now due no later than August 11, 2006. The final results continue to be due 120 days after publication of the preliminary results.

Start Signature

Dated: April 11, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Preamble

[FR Doc. E6-5776 Filed 4-17-06; 8:45 am]