Skip to Content

Notice

Polyethylene Retail Carrier Bags from the People's Republic of China: Extension of Time Limit for the Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

April 27, 2006.

Start Further Info Start Printed Page 24840

FOR FURTHER INFORMATION CONTACT:

Laurel LaCivita or Matthew Quigley, AD/CVD Operations, Office 8, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone (202) 482-4243 or (202) 482-4551, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On September 28, 2005, the Department of Commerce (“the Department”) published in the Federal Register a notice of initiation of the antidumping duty administrative review of Polyethylene Retail Carrier Bags (“PRCBs”) from the People's Republic of China (“PRC”) for the period January 24, 2004, through July 31, 2005. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 70 FR 56631 (September 28, 2005). The preliminary results of review are currently due no later than May 3, 2006.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested. Section 751(a)(3)(A) of the Act further states that, if it is not practicable to complete the review within the time specified, the administering authority may extend the 245-day period to issue its preliminary results by up to 120 days. Completion of the preliminary results of this review within the 245-day period is not practicable because the Department needs additional time to analyze a significant amount of information pertaining to each company's sales practices, factors of production, corporate relationships, and to review responses to supplemental questionnaires.

Because it is not practicable to complete this review within the time specified under the Act, we are extending the time period for issuing the preliminary results of review by 110 days until August 21, 2006, in accordance with section 751(a)(3)(A) of the Act. The final results continue to be due 120 days after the publication of the preliminary results of review.

Start Signature

Dated: April 21, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E6-6368 Filed 4-26-06; 8:45 am]

BILLING CODE 3510-DS-S