Skip to Content

Notice

Notice of Correction to Notice of Extension of Time Limit for Final Results of Antidumping Duty Administrative Review: Certain Malleable Iron Pipe Fittings from the People's Republic of China

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

April 28, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Sochieta Moth, AD/CVD Operations, Office 8, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone; (202) 482-0168.

End Further Info

Correction:

On April 6, 2006, the Department of Commerce (“The Department”) published a notice of extension of time limit for the final results of the antidumping administrative review of the order on certain malleable iron pipe fittings from the People's Republic of China for the period December 2, 2003, through November 30, 2004. See Notice of Extension of Time Limit for Final Results of Antidumping Duty Administrative Review: Certain Malleable Iron Pipe Fittings From the People's Republic of China, 71 FR 17439 (April 6, 2006) (“Extension Notice”). Subsequent to the publication of the Extension Notice, we identified an inadvertent clerical error in the Federal Register.

The case number was incorrectly identified as A-570-831. The Extension Notice should be corrected to list the case number as A-570-881.

This correction is issued and published in accordance with section Start Printed Page 25149777(i) of the Tariff Act of 1930, as amended.

Start Signature

Dated: April 21, 2006.

Joseph A. Spetrini,

Acting Assistant Secretary for Import Administration.

End Signature End Preamble

[FR Doc. E6-6436 Filed 4-27-06; 8:45 am]

BILLING CODE 3510-DS-S