Skip to Content

Notice

Stainless Steel Sheet and Strip in Coils from Mexico: Extension of Time Limit for Final Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

September 5, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Maryanne Burke or Robert James, AD/CVD Operations, Office 7, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW, Washington, DC 20230; telephone: (202) 482-5604 or (202) 482-0649, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

On June 21, 2006, the Department of Commerce (the Department) published the preliminary results of the administrative review of the antidumping duty order on stainless steel sheet and strip in coils from Mexico for the period July 1, 2004, through June 30, 2005. See Stainless Steel Sheet and Strip in Coils from Mexico; Preliminary Results of Antidumping Duty Administrative Review, 71 FR 35618 (June 21, 2006). The current deadline for the final results of this review is October 19, 2006.

Extension of Time Limits for Final Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Tariff Act), requires the Department to issue the final results of an administrative review within 120 days after the date on which the preliminary results were published. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Tariff Act allows the Department to extend the time limit for the final results to 180 days from the date of publication of the preliminary results.

The Department finds that it is not practicable to complete this review within the original time frame due to a number of significant case issues, including the calculation of parent company interest expenses and general and administrative expenses. Furthermore, additional time is necessary for the Department to analyze certain adjustments made to U.S. price and to evaluate the commercial transactions between Mexinox and affiliated parties. Consequently, and in accordance with section 751(a)(3)(A) of the Tariff Act and 19 CFR 351.213(h)(2), the Department is extending the time limit for completion of the final results of this administrative review until no later than December 18, 2006, which is 180 days from the date of publication of the preliminary results. This notice is published in accordance with section 751(a)(3)(A) of the Tariff Act.

Start Signature

Dated: August 29, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E6-14653 Filed 9-1-06; 8:45 am]

BILLING CODE 3510-DS-S