Skip to Content

Notice

Notice of Effectiveness of Exempt Wholesale Generator Status

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble November 1, 2006.
CalPeak Power LLCDocket No. EG06-68-000.
Spanish Ford Wind Park 2, LLCDocket No. EG06-69-000.
Evergreen Wind Power, LLCDocket No. EG06-71-000.
Mt. Tom Generating Company LLCDocket No. EG06-72-000.
BG Dighton Power, LLCDocket No. EG06-73-000.
FPL Energy Oliver Wind, LLCDocket No. EG06-74-000.
Allegheny Ridge Wind Farm, LLCDocket No. EG06-75-000.
Noble Clinton Windpark I, LLCDocket No. EG06-76-000.
Noble Ellenburg Windpark, LLCDocket No. EG06-77-000.
Noble Altona Windpark, LLCDocket No. EG06-78-000.
Noble Bliss Windpark, LLCDocket No. EG06-79-000.
Hawks Nest Hydro LLCDocket No. EG06-80-000.
Start Printed Page 65482

Take notice that during the month of October 2006, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a).

Start Signature

Magalie R. Salas,

Secretary.

End Signature End Preamble

[FR Doc. E6-18812 Filed 11-7-06; 8:45 am]

BILLING CODE 6717-01-P