Skip to Content

Notice

Non-Malleable Cast Iron Pipe Fittings from the People's Republic of China: Extension of Time Limit for the Final Results of the Antidumping Duty Administrative Review for the Period April 1, 2004 through March 31, 2005

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

November 16, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Eugene Degnan, AD/CVD Operations, Office 8, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone: (202) 482-0414.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On May 25, 2006, the Department of Commerce (“the Department”) published in the Federal Register its preliminary results of the second administrative review on non-malleable cast iron pipe fittings from the People's Republic of China (“PRC”). See Non-Malleable Cast Iron Pipe Fittings from the People's Republic of China: Preliminary Results of Antidumping Duty Administrative Review, 71 FR 30116 (May 25, 2006) (“Preliminary Results”). On September 12, 2006, the Department published a notice extending the time limit for the final results of the administrative review from September 22, 2006, to October 23, 2006. See Extension of Time Limit for the Final Results of the Antidumping Duty Administrative Review: Non-Malleable Cast Iron Pipe Fittings from the People's Republic of China, 71 FR 53661 (September 12, 2006). On October 30, 2006, the Department published a notice extending the time limit for the final results of the administrative review from October 23, 2006, to November 10, 2006. See Non-Malleable Cast Iron Pipe Fittings from the People's Republic of China: Extension of Time Limit for the Final Results of the Antidumping Duty Administrative Review: , 71 FR 63285 (October 30, 2006). The final results of this administrative review are currently due no later than November 10, 2006.

Extension of Time Limit of Final Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue final results within 120 days of the date on which the preliminary results are published. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the 120-day period to a maximum of 180 days. Completion of the final results of this review within the 120-day period is not practicable because the Department needs additional time to evaluate the arguments and issues raised by the petitioners and respondents in their respective case briefs and rebuttal briefs.

Because it is not practicable to complete this review within the time specified under the Act, we are extending the time period for issuing the final results of this review an Start Printed Page 66750additional 11 days to 180 days, in accordance with section 751(a)(3)(A) of the Act. Therefore, the final results will be due no later than November 21, 2006. This notice is published pursuant to sections 751(a) and 777(i) of the Act.

Start Signature

Dated: November 8, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E6-19402 Filed 11-15-06; 8:45 am]

BILLING CODE 3510-DS-S