Skip to Content

Correction

Intent to Prepare a Draft Environmental Impact Statement for the Port Canaveral Navigation Improvements Section 203 Feasibility Study Located in Brevard County, FL

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 13352 End Preamble Start Supplemental Information

Correction

In notice document 07-1278 beginning on page 12598 in the issue of Friday, March 16, 2007, make the following corrections:

1. On page 12598, in the second column, in lettered paragraph c., in the tenth line, “(2) reduce” should read “(1) reduce”.

2. On page 12599, in the first column, in lettered paragraph h., “and Wildlife Service under Section 7 of” should read “and Wildlife Service (FWS) and the National Marine Fisheries Service under Section 7 of”.

End Supplemental Information Start Preamble End Preamble Start Supplemental Information

Correction

In rule document E7-2667 beginning on page 8428 in the issue of Monday, February 26, 2007, make the following correction:

[Corrected]

On page 8564, in § 86.11-09(t)(2), in the second column, in Table S09-5, in the column heading for the first column, “Model Year of Introduction 2010” should read “Model Year of Introduction”.

End Supplemental Information Start Preamble End Preamble Start Supplemental Information

Correction

In rule document E7-3061 beginning on page 8115 in the issue of Friday, February 23, 2007, make the following corrections:

1. On page 8124, the tables entitled “District One” and “District Two” are corrected to read as set forth below.

District One

Area 1 St. Lawrence RiverArea 2 Lake OntarioTotal district one
Pilot Compensation$1,368,253$825,760$2,194,013
Expense Multiplier× .31169× .52779× .39283
Projected Increase in Operating Expense=$426,468=$435,829=$861,881

District Two

Area 4 Lake ErieArea 5 southeast Shoal to Port Huron, MITotal district two
Pilot Compensation$825,760$1,596,295$2,422,055
Expense Multiplier× .61678× .46605× .51731
Projected increase in Operating Expense=$509,310=$743,956=$1,252,960

2. On page 8125, at the top of the page, the table entitled “District Three” is corrected to read as set forth below.Start Printed Page 13353

District Three

Area 6 Lakes Huron and MichiganArea 7 St. Mary's RiverArea 8 Lake SuperiorTotal district three
Pilot Compensation$1,651,520$912,168$1,156,064$3,719,752
Expense Multiplier× .49543× .34956× .44178× .44290
Projected Increase in Operating Expense=$818,205=$318,861=$510,730=$1,647,478
[Corrected]

3. On page 8131, in § 401.407(a), the table is corrected to read as set forth below.

ServiceLake Erie (east of Southeast Shoal)Buffalo
Six-Hour Period$641$641
Docking or Undocking494494
Any Point on the Niagara River below the Black Rock LockN/A1,261

4. On the same page, in § 401.407(b), the table is corrected to read as set forth below.

Any point on or inSoutheast ShoalToledo or any point on Lake Erie west of Southeast ShoalDetroit RiverDetroit pilot boatSt. Clair River
Toledo or any port on Lake Erie west of Southeast Shoal$1,699$1,004$2,206$1,699N/A
Port Huron Change Point1 2,9591 3,4282,2231,729$1,229
St. Clair River1 2,959N/A2,2232,2231,004
Detroit or Windsor or the Detroit River1,6992,2061,004N/A2,223
Detroit Pilot Boat1,2291,699N/AN/A2,223
1 When pilots are not changed at the Detroit Pilot Boat.
End Supplemental Information

[FR Doc. C7-1278 Filed 3-20-07; 8:45 am]

BILLING CODE 1505-01-D

[FR Doc. Z7-2667 Filed 3-20-07; 8:45 am]

BILLING CODE 1505-01-D

[FR Doc. Z7-3061 Filed 3-20-07; 8:45 am]

BILLING CODE 1505-01-D