Skip to Content


Corrosion-Resistant Carbon Steel Flat Products from Korea: Extension of Time Limits for the Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble


Import Administration, International Trade Administration, Department of Commerce.

Start Further Info


Victoria Cho at (202) 482-5075, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW, Washington, DC 20230.

End Further Info End Preamble Start Supplemental Information



On September 29, 2006, the U.S. Department of Commerce (“Department”) published a notice of initiation of the administrative review of the antidumping duty order on corrosion-resistant carbon steel flat products from Korea, covering the period August 1, 2005 to July 31, 2006. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 71 FR 57465 (September 29, 2006). The preliminary results of this review are currently due no later than May 3, 2007.

Extension of Time Limit of Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested. Section Start Printed Page 19689751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results by up to 120 days.

We determine that completion of the preliminary results of this review within the 245-day period is not practicable for the following reasons. This review covers three companies, and to conduct the sales and cost analyses for each company requires the Department to gather, analyze and verify a significant amount of information pertaining to each company's sales practices, manufacturing costs and corporate relationships. Given the number and complexity of issues in this case, and in accordance with section 751(a)(3)(A) of the Act, we are extending the time period for issuing the preliminary results of review by 120 days. Therefore, the preliminary results are now due no later than August 31, 2007. The final results continue to be due 120 days after publication of the preliminary results.

Start Signature

Dated: April 11, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E7-7385 Filed 4-18-07; 8:45 am]