Skip to Content

Notice

Polyethylene Retail Carrier Bags from the People's Republic of China; Notice of Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

April 27, 2007.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Zev Primor and Maisha Cryor, AD/CVD Operations, Office 4, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone: (202) 482-4114 and (202) 482-5831, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On September 29, 2006, the Department of Commerce (“Department”) published a notice of initiation of administrative review of the antidumping duty order on polyethylene retail carrier bags from the People's Republic of China (“PRC”). See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 71 FR 57465 (September 29, 2006). The period of review is August 1, 2005, through July 31, 2006. The preliminary results of this administrative review are currently due no later than May 3, 2007.

Extension of Time Limit for Preliminary Results

Pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“Act”), the Department shall make a preliminary determination in an administrative review of an antidumping order within 245 days after the last day of the anniversary month of the date of publication of the order. Section 751(a)(3)(A) of the Act further provides, however, that the Department may extend the 245-day period to 365 days if it determines it is not practicable to complete the review within the foregoing time period. The Department determines that it is not practicable to complete this administrative review within the time limits mandated by section 751(a)(3)(A) of the Act because this review involves examining a number of complex issues related to sales information and to factors of production. The Department requires additional time to issue and analyze supplemental questionnaires regarding these issues. Therefore, in accordance with section 751(a)(3)(A) of the Act, the Department is extending the time period for completing the preliminary results of this administrative review until August 31, 2007, which is 365 days from the last day of the anniversary month of the date of publication of the order. The deadline for the final results of the review continues to be 120 days after the publication of the preliminary results.

This extension notice is issued and published in accordance with sections 751(a)(3)(A) and 777(i) of the Act.

Start Signature

Dated: April 23, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E7-8130 Filed 4-26-07; 8:45 am]

BILLING CODE 3510-DS-S