Skip to Content

Correction

Published Document: Z7-7519 (72 FR 21320)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

( printed page 21320-22232)

Correction

In rule document E7-7519 beginning on page 19790 in the issue of Friday, April 20, 2007, make the following correction:

[Corrected]

On page 19792, in § 39.13(e), in the table, entry (1) is corrected to read as follows:

Actions Compliance Procedures
(1) Remove power to the ground power electrical cable by: (i) Disconnecting the electrical cable at the forward ground power relay and the starter relay, or (ii) Removing the electrical cable between the forward ground power relay and the starter relay. Within 15 days after April 25, 2007 (the effective date of this AD) Follow Air Plains Services Corporation Mandatory Service Bulletin APS-07-01-01, dated March 5, 2007.
*       *       *        *       *       *       *

Correction

In notice document 07-1826 beginning on page 18747 in the issue of Friday, April 13, 2007, make the following corrections:

1. On page 18747, in the first column, in the second paragraph, in the second line, “know” should read “known”.

2. On the same page, in the second column, in the second line from the bottom of the column, “Ramahnathan” should read “Ramanathan”.

[FR Doc. Z7-7519 Filed 4-27-07; 8:45 am]

BILLING CODE 1505-01-D

[FR Doc. C7-1826 Filed 4-27-07; 8:45 am]