Skip to Content

Notice

Corrosion-Resistant Carbon Steel Flat Products from the Republic of Korea: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 26338

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

May 9, 2007.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Gayle Longest or Robert Copyak, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW, Washington, DC 20230; telephone: (202) 482-3338 or (202) 482-2209, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On September 29, 2006, the U.S. Department of Commerce (“the Department”) published a notice of initiation of the administrative review of the countervailing duty order on corrosion-resistant carbon steel flat products from the Republic of Korea covering the period of review January 1, 2005, through December 31, 2005. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 71 FR 57465 (September 29, 2006). The preliminary results are currently due no later than May 3, 2007.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested. Section 751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results by up to 120 days.

Due to the complexity of the issues in this administrative review, we have determined that it is not practicable to complete the preliminary results of this review within the 245-day period. Therefore, in accordance with section 751(a)(3)(A) of the Act, we are extending the time period for issuing the preliminary results of the review by 120 days. The preliminary results are now due no later than August 31, 2007. The final results continue to be due 120 days after publication of the preliminary results.

This notice is issued and published in accordance with section 751(a)(3)(A) of the Act.

Start Signature

Dated: May 2, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E7-8906 Filed 5-8-07; 8:45 am]

BILLING CODE 3510-DS-S