Notice

Stainless Steel Wire Rod From Sweden: Notice of Extension of Time Limit for 2005-2006 Administration Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

May 29, 2007.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Brian Smith or Gemal Brangman, AD/CVD Operations, Office 2, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone (202) 482-1766 or (202) 482-3773, respectively.

Background

On October 31, 2006, the Department published in the Federal Register a notice of initiation of administrative review of the antidumping duty order on stainless steel wire rod from Sweden, covering the period September 1, 2005, through August 31, 2006. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 71 FR 63752 (October 31, 2006). The preliminary results for this administrative review are currently due no later than June 4, 2007.1

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department of Commerce (“Department”) to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Extension of Time Limits for Preliminary Results

The Department requires additional time to review and analyze the sales and cost information submitted by the respondent in this administrative review and, if necessary, issue an additional supplemental questionnaire. Thus, it is not practicable to complete this review within the original time limit. Therefore, the Department is partially extending the time limit for completion of the preliminary results by 90 days to 335 days, in accordance with section 751(a)(3)(A) of the Act. The preliminary results are now due no later than August 31, 2007. The final results continue to be due 120 days after publication of the preliminary results.

We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.

Start Signature

Dated: May 21, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Further Info End Preamble

Footnotes

1.  June 4, 2007, is the next business day after 245 days from the last day of the anniversary month of the order.

Back to Citation

[FR Doc. E7-10251 Filed 5-25-07; 8:45 am]