This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
12
as of
09/08/2026 at 8:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
August 8, 2007.
FOR FURTHER INFORMATION CONTACT:
Catherine Cartsos or Minoo Hatten, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-1757 and (202) 482-1690, respectively.
SUPPLEMENTARY INFORMATION:
Background
On March 20, 2007, the Department of Commerce (the Department) published a notice of initiation of a new-shipper review of the antidumping duty order on stainless steel wire rods from India for Sunflag Iron and Steel Co., Ltd. (Sunflag).
See Stainless Steel Wire Rod From India: Notice of Initiation of Antidumping Duty New-Shipper Review, 72 FR 13088 (March 20, 2007). The period of review is December 1, 2005, through November 30, 2006. The preliminary results of this new-shipper review are currently due no later than September 9, 2007.
Extension of Time Limit for Preliminary Results
Section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended (the Act), provides that the Department will issue the preliminary results of a new-shipper review of an antidumping duty order within 180 days after the date on which the review is initiated. The Act provides further that, if the case is extraordinarily complicated, the Department may extend the 180-day period to 300 days.
The Department has determined that this new-shipper review is extraordinarily complicated and it is not possible to complete the preliminary results by the current deadline of September 9, 2007. Specifically, there are a number of complex factual issues pertaining to the sales practices, manufacturing costs, and the determination of potential comparison-market matches which affect the calculation of the antidumping margin in this new-shipper review. We require additional time to analyze the questionnaire responses, issue supplemental questionnaires, and conduct verification. Therefore, in accordance with section 751(a)(2)(B)(iv) of the Act and 19 CFR 351.214(i)(2), the Department is extending the time limit for the preliminary results by 40 days to October 19, 2007. The final results of the new-shipper review continue to be due 90 days after the date of issuance of the preliminary results of new-shipper review.
( printed page 44497)
We are issuing this notice in accordance with sections 751(a)(2)(B)(iv) and 777(i)(1) of the Act.
Dated: August 2, 2007.
Gary Taverman,
Acting Deputy Assistant Secretary for Import Administration.