Skip to Content

Notice

California Independent System Operator Corporation; Notice Establishing Post-Technical Conference Schedule

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble October 2, 2007.

In accordance with the directive of the September 21, 2006, Order Conditionally Accepting the California Independent System Operator Corporation's (CAISO) Electric Tariff Filing to Reflect Market Redesign and Technology Upgrade (MRTU),[1] Federal Energy Regulatory Commission staff convened a technical conference on September 26-27, 2007, to help determine which practices or details in the Business Practice Manuals (BPMs) should be included in the MRTU Tariff.

As stated at the technical conference, the CAISO will file a response concerning the issues discussed at the technical conference by November 15, 2007. Following the CAISO's filing, parties may file comments, due on November 30, 2007, and reply comments, due on December 7, 2007.

Start Signature

Kimberly D. Bose,

Secretary.

End Signature End Preamble

Footnotes

1.  Cal. Indep. Sys. Operator Corp., 116 FERC ¶ 61,274, at P 1370 (2006).

Back to Citation

[FR Doc. E7-19904 Filed 10-9-07; 8:45 am]

BILLING CODE 6717-01-P