Skip to Content

Notice

Fresh Garlic from the People's Republic of China: Extension of Time Limits for the Preliminary Results of the New Shipper Reviews

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

November 16, 2007.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Julia Hancock, AD/CVD Operations, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone: (202) 482-1394.

Background

On July 12, 2007, the Department published a notice of initiation of new shipper reviews of fresh garlic from the PRC covering the period November 1, 2006, through April 30, 2007. See Fresh Garlic from the People's Republic of China: Initiation of New Shipper Reviews, 72 FR 38057 (July 12, 2007). The preliminary results of these new shipper reviews are currently due no later than December 26, 2007.

Statutory Time Limits

Section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended (the “Act”), provides that the Department will issue the preliminary results of a new shipper review of an antidumping duty order within 180 days after the day on which the review was initiated. See also 19 CFR 351.214 (i)(1). The Act further provides that the Department may extend that 180-day period to 300 days if it determines that the case is extraordinarily complicated. See 19 CFR 351.214 (i)(2).

Extension of Time Limit of Preliminary Results

The Department determines that these new shipper reviews involve extraordinarily complicated Start Printed Page 64580methodological issues such as the use of intermediate input methodology, potential affiliation issues, the examination of importer information and the evaluation of the bona fide nature of each company's sales. Therefore, in accordance with section 751(a)(2)(B)(iv) of the Act and 19 CFR 351.214(i)(2), the Department is extending the time limit for these preliminary results by 90 days, until no later than March 25, 2008. The final results continue to be due 90 days after the publication of the preliminary results.

We are issuing and publishing this notice in accordance with sections 751(a)(2)(B)(iv) and 777(i) of the Act.

Start Signature

Dated: November 5, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Further Info End Preamble

[FR Doc. E7-22348 Filed 11-15-07; 8:45 am]

BILLING CODE 3510-DS-S