Skip to Content

Notice

Certain Steel Concrete Reinforcing Bars from Turkey; Notice of Extension of Time Limit for Preliminary Results in Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

November 16, 2007.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Irina Itkin, AD/CVD Operations, Office 2, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC, 20230; telephone (202) 482-0656.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On May 30, 2007, the Department of Commerce (the Department) published a notice of initiation of administrative review of the antidumping duty order on certain steel concrete reinforcing bars from Turkey. See Initiation of Antidumping Duty and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 72 FR 29968 (May 30, 2007). The period of review is April 1, 2006, through March 31, 2007, and the preliminary results are currently due no later than December 31, 2007. The review covers nine producers/exporters of the subject merchandise to the United States.

Extension of Time Limit for Preliminary Results

Pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), the Department shall make a preliminary determination in an administrative review of an antidumping order within 245 days after the last day of the anniversary month of the date of publication of the order. The Act further provides, however, that the Department may extend the 245-day period to 365 days if it determines that it is not practicable to complete the review within the foregoing time period. We determine that it is not practicable to complete this administrative review within the time limits mandated by section 751(a)(3)(A) of the Act because this review involves a number of complicated issues for certain of the respondents, including a request for revocation for one of the respondents. Analysis of these issues requires additional time.

In addition, we are also conducting numerous concurrent antidumping Start Printed Page 64584proceedings which place a constraint on the number of analysts that can be assigned to this case. Not only do these other cases present a significant workload, but the deadlines for a number of the cases coincide and/or overlap with deadlines in this antidumping proceeding. Therefore, we have fully extended the deadline for completing the preliminary results until April 29, 2008, which is 365 days from the last day of the anniversary month of the date of publication of the order. The deadline for the final results of the review continues to be 120 days after the publication of the preliminary results.

This extension is in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: November 8, 2007.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E7-22467 Filed 11-15-07; 8:45 am]

BILLING CODE 3510-DS-S