This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Notice of Extension of Time Limit for the Final Results of Antidumping Duty Administrative Review
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Notice of Extension of Time Limit for the Final Results of Antidumping Duty Administrative Review
Notice of final results and final rescission in part of the antidumping duty administrative review of certain stainless steel butt- weld pipe fittings from Taiwan.
Notice of final results in the antidumping duty administrative review of certain stainless steel butt-weld pipe fittings from Taiwan and intent not to revoke in part.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
18
as of
11/12/2026 at 12:15 pm EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
SUMMARY:
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on certain stainless steel butt-weld pipe fittings from Taiwan. The period of review is June 1, 2005, through May 31, 2006. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act).
EFFECTIVE DATE:
December 19, 2007.
FOR FURTHER INFORMATION CONTACT:
Judy Lao or John Drury, Office 7, AD/CVD Operations, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230, telephone: (202) 482-7924 and (202) 482-0195, respectively.
SUPPLEMENTARY INFORMATION:
Background
On July 2, 2007, the Department published the preliminary results of the administrative review of the antidumping duty order on certain stainless steel butt-weld pipe fittings from Taiwan covering the period June 1, 2005, through May 31, 2006.
See
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Preliminary Results of Antidumping Duty Administrative Review and Intent to Rescind in Part, 72 FR 35970 (July 2, 2007). The final results for the antidumping duty administrative review of certain stainless steel butt-weld pipe fittings from Taiwan are currently due no later than December 14, 2007.
Extension of Time Limits for Final Results
Section 751(a)(3)(A) of the Act requires the Department to issue the results in an administrative review within 120 days of the publication of the preliminary results. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the final results to 180 days (or 300 days
( printed page 71877)
if the Department does not extend the time limit for the preliminary results) from the date of publication of the preliminary results.
In accordance with section 751(a)(3)(A) of the Act, and 19 CFR 351.213(h)(2), the Department finds that it is not practicable to complete the review within the original time frame (
i.e., by December 14, 2007). Specifically, the Department requires additional time to complete the fact-intensive analysis of the record required by certain issues, such as questions of affiliation, raised in the case briefs. Because it is not practicable to complete this administrative review within the time limit mandated by section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), the Department is extending the time limit for completion of the final results of this administrative review by 15 days, to no later than December 31, 2007.
1
This notice is published pursuant to sections 751(a)(1) and 777(i)(1) of the Act.
Dated: December 12, 2007.
Stephen J. Claeys,
Deputy Assistant Secretary for Import Administration.
Footnotes
1.
The extension of time by 180 days would result in the completion of the final results of review on December 29, 2007. As December 29, 2007, is a Saturday, the completion date falls to the next workday, which is Monday, December 31, 2007.