Skip to Content

Notice

Northern Natural Gas Company; Notice of Request Under Blanket Authorization

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble January 3, 2008.

Take notice that on December 21, 2007, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in Docket No. CP08-42-000 a prior notice request pursuant to sections 157.205 and 157.210 of the Commission's regulations under the Natural Gas Act (NGA) and Northern's blanket certificate issued September 1, 1982 in Docket No. CP82-401-000, for authorization to up-rate the maximum allowable operating pressure (MAOP) on approximately twenty-four miles of 26-inch pipeline in Yoakum and Gaines Counties, Texas, and Lea County, New Mexico, and operate such segment of pipeline at the higher MAOP, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the Start Printed Page 1869last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY (202) 502-8659.

The estimated cost of constructing the proposed facilities is $1,015,000.

Any questions regarding the application should be directed to Michael T. Loeffler, Senior Director of Certificates and External Affairs, 1111 South 103rd Street, Omaha, Nebraska 68124, Northern Natural Gas Company, phone (402) 398-7103.

Any person or the Commission's Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

This filing is accessible on-line at http://www.ferc.gov, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Start Signature

Kimberly D. Bose,

Secretary.

End Signature End Preamble

[FR Doc. E8-224 Filed 1-9-08; 8:45 am]

BILLING CODE 6717-01-P