This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Proposed Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Interested parties should submit written comments to the FAR Secretariat on or before June 2, 2008 to be considered in the formulation of a final rule.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
72
as of
09/07/2026 at 4:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCIES:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Proposed rule with request for comments.
SUMMARY:
The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) are proposing to amend the Federal Acquisition Regulation (FAR) to revise the contractor performance information process. The FAR revisions include changes to FAR Parts 2, 9, 13, 17, 36, 42, and 53.
DATES:
Interested parties should submit written comments to the FAR Secretariat on or before June 2, 2008 to be considered in the formulation of a final rule.
ADDRESSES:
Submit comments identified by FAR case 2006-022 by any of the following methods:
Regulations.gov: http://www.regulations.gov.
Submit comments via the Federal eRulemaking portal by inputting “FAR Case 2006-022” under the heading “Comment or Submission”. Select the link “Send a Comment or Submission” that corresponds with FAR Case 2006-022. Follow the instructions provided to complete the “Public Comment and Submission Form”. Please include your name, company name (if any), and “FAR Case 2006-022” on your attached document.
Fax:
202-501-4067.
Mail:
General Services Administration, Regulatory Secretariat (VPR), 1800 F Street, NW., Room 4035, ATTN: Diedra Wingate, Washington, DC 20405.
Instructions:
Please submit comments only and cite FAR Case 2006-022 in all correspondence related to this case. All comments received will be posted without change to
http://www.regulations.gov,
including any personal and/or business confidential information provided.
FOR FURTHER INFORMATION CONTACT:
Ms. Jeritta A. Parnell, Procurement Analyst, at (202) 501-4082 for clarification of content. For information pertaining to status or publication schedules, contact the FAR Secretariat at (202) 501-4755. Please cite FAR case 2006-022.
SUPPLEMENTARY INFORMATION:
A. Background
The Office of Federal Procurement Policy (OFPP) and the Chief Acquisition Officer's Acquisition Committee for E-GOV (ACE) established a working group to review regulations, policies, and guidance associated with contractor performance information. This working group proposed changes to a number of FAR parts. The Councils have agreed to some, but not all, of these changes. This proposed rule reflects those changes agreed to by the Councils. The changes to the FAR include the following:
(1) Adds a definition in FAR 2.101 for “past performance” to include both active and completed contracts;
(2) Clarifies the use of the governmentwide performance information repository, Past Performance Information Retrieval System (PPIRS) at
http://www.ppirs.gov;
(3) Requires contracting officers to evaluate past performance for orders that exceed the simplified acquisition threshold placed against Federal Supply Schedule contract, or under a task order contract or a delivery order contract awarded by another agency (i.e. governmentwide acquisition contract or multi-agency contract) and recommends past performance evaluations for orders under single agency contracts;
(4) Consolidates the collection of past performance guidance in Part 42 and deletes the SF 1420 and 1421 from Part 36 and Part 53; and
(5) Clarifies that the agency shall identify the individual responsible for preparing the evaluation of contractor past performance.
This is not a significant regulatory action and, therefore, was not subject to review under Section 6(b) of Executive Order 12866, Regulatory Planning and Review, dated September 30, 1993. This is not a major rule under 5 U.S.C. 804.
B. Regulatory Flexibility Act
The Councils do not expect this proposed rule to have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act, 5 U.S.C. 601,
et seq., because the rule does not impose any additional requirements on small businesses. The collection and reporting of past performance information is an internal process to the Government. The rule merely puts into effect the current practices of prudent contracting officers. In addition, the rule provides clearer instruction to contracting officers by restating in a better format the current language. Past performance evaluations are now made on master contracts based on the performance reported on the individual orders. This rule allows separate rather than consolidated evaluations under these types of contracts. There should be a small positive benefit for small businesses when individual instant reports are made rather than waiting for long-term reports on the master contract. Likewise, when small businesses have negative reports, the small businesses can take corrective action sooner. Therefore, an Initial Regulatory Flexibility Analysis has not been performed. The Councils will consider comments from small entities concerning the affected FAR Parts 2, 9, 13, 17, 36, 42, and 53 in accordance with 5 U.S.C. 610. Interested parties must submit such comments separately and should cite 5 U.S.C. 601,
et seq.
(FAR Case 2006-022) in correspondence.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply because the proposed changes to the FAR do not impose information collection requirements that require the approval of the Office of Management and Budget under 44 U.S.C. 3501,
et seq.
(c) In making the determination of responsibility (see 9.104-1(c)), the contracting officer shall consider relevant past performance information (see Subpart 42.15). In addition to the Governmentwide performance information repository, Past Performance Information Retrieval System (PPIRS) (at
http://www.ppirs.gov), the contracting officer should use the following sources of information to support such determinations:
* * * * *
PART 13—SIMPLIFIED ACQUISITION PROCEDURES
4. Amend section 13.106-2 by revising paragraph (b)(3)(ii) to read as follows:
(a) Past performance evaluations should be as specified in paragraphs (b) through (g) of this section at the time the work under the contract or order is completed. In addition, interim evaluations should be prepared as specified by the agencies to provide current information for source selection purposes, for contracts or orders with a period of performance, including options, exceeding one year. These evaluations are generally for the entity, division, or unit that performed the contract or order. The content of the evaluations should be tailored to the size, content, and complexity of the contractual requirements.
(b) Except as provided in paragraphs (e), (f), and (h) of this section, agencies shall prepare an evaluation of contractor performance for each contract that exceeds the simplified acquisition threshold.
(c) Agencies shall prepare an evaluation of contractor performance for each order that exceeds the simplified acquisition threshold placed against a Federal Supply Schedule contract, or under a task order contract or a delivery order contract awarded by another agency (i.e., Governmentwide acquisition contract or multi-agency contract).
(d) For single-agency task order and delivery order contracts, the contracting officer may require performance evaluations for each order in excess of the simplified acquisition threshold when such evaluations would produce more useful past performance information for source selection officials than that contained in the overall contract evaluation (e.g., when the scope of the basic contract is very broad and the nature of individual orders could be significantly different).
(e) Past performance evaluations shall be prepared for each construction contract of $550,000 or more, and for each construction contract terminated for default regardless of contract value. Past performance evaluations may also be prepared for construction contracts below $550,000.
(f) Past performance evaluations shall be prepared for each architect-engineer services contract of $30,000 or more, and for each architect-engineer services contract that is terminated for default regardless of contract value. Past performance evaluations may also be prepared for architect-engineer services contracts below $30,000.
(g) Past Performance evaluations shall include an assessment of contractor performance against, and efforts to achieve, the goals identified in the small business subcontracting plan when the contract includes the clause at 52.219-9, Small Business Subcontracting Plan.
(h) Agencies shall not evaluate performance for contracts awarded under Subpart 8.7.
11. Amend section 42.1503 by revising paragraphs (a), (c), (d) and (e) to read as follows:
(a) Agency procedures for the past performance evaluation system shall generally provide for input to the evaluations from the technical office, contracting office and, where appropriate, end users of the product or service. These procedures shall identify the individual responsible for preparing interim and final evaluation. This designated individual may obtain information for the evaluation of performance from the program office,
( printed page 17947)
administrative contracting office, end users of the product or service, and any other technical or business advisor, as appropriate. Interim evaluations shall be prepared as required.
* * * * *
(c) Agencies shall submit past performance reports electronically to the Past Performance Information Retrieval System (PPIRS) at
http://www.ppirs.gov
in accordance with agency procedures.
(d) Any past performance information systems used for maintaining contractor performance information and/or evaluations should include appropriate management and technical controls to ensure that only authorized personnel have access to the data.
(e) For source selection purposes, agencies shall use the past performance information in PPIRS within three years (six for construction and architect-engineer contracts) of the completion of performance of the evaluated contract or order.
12. Amend section 53.236-1 by removing paragraphs (a) through (c) and redesignating existing paragraphs (d) through (f) as new paragraphs (a) through (c), respectively.