Skip to Content

Notice

Carbon and Certain Alloy Steel Wire Rod from Trinidad and Tobago: Extension of Time Limit for the Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

April 14, 2008.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Dennis McClure or Stephanie Moore, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave., NW, Washington, DC 20230; telephone: (202) 482-5973 and (202) 482-3692, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On November 26, 2007, the U.S. Department of Commerce (“the Department”) published a notice of initiation of the administrative review of the antidumping duty order on carbon and certain alloy steel wire rod from Trinidad and Tobago, covering the period October 1, 2006, to September 30, 2007. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 72 FR 65938 (November 26, 2007). The preliminary results of this review are currently due no later than July 2, 2008.

Extension of Time Limit of Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination in an administrative review within 245 days after the last day of the anniversary month of an order or finding for which a review is requested. Consistent with section 751(a)(3)(A) of the Act, the Department may extend the 245-day period to 365 days if it is not practicable to complete the review within a 245-day period.

We determine that completion of the preliminary results of this review within the 245-day period is not practicable. Specifically, Gerdau Ameristeel US Inc., Nucor Steel Connecticut Inc., Keystone Consolidated Industries, Inc., and Rocky Mountain Steel Mills (collectively, petitioners) have raised a number of issues which require the collection of additional data and analysis. In addition, we need additional time to thoroughly consider the responses to the supplemental questionnaires the Department has sent to the respondent.

Therefore, we are extending the time period for issuing the preliminary results of review by 120 days to October 30, 2008, in accordance with section 751(a)(3)(A) of the Act and 19 CFR § 351.213(h)(2) of the Department's regulations. Therefore, the preliminary results are now due no later than October 30, 2008. The final results continue to be due 120 days after publication of the preliminary results.

This notice is published in accordance with sections 751(a)(3)(A) and 777(i) of the Act.

Start Signature

Dated: April 8, 2008.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E8-7891 Filed 4-11-08; 8:45 am]

BILLING CODE 3510-DS-S