Skip to Content

Notice

Published Document: E8-23566 (73 FR 58113)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: October 6, 2008.

FOR FURTHER INFORMATION CONTACT:

Paul Stolz, AD/CVD Operations, Office 8, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-4474.

Background

The Department of Commerce (“the Department”) published an antidumping duty order on wooden bedroom furniture (“WBF”) from the People's Republic of China (“PRC”) on January 4, 2005. See Notice of Amended Final Determination of Sales at Less Than Fair Value and Antidumping Duty Order: Wooden Bedroom Furniture From the People's Republic of China,70 FR 329 (January 4, 2005). On March 7, 2008, the Department published in the Federal Register a notice of the initiation of the antidumping duty administrative review of WBF from the PRC and new shipper reviews for the period January 1, 2007 through December 31, 2007. See Notice of Initiation of Administrative Review of the Antidumping Duty Order on Wooden Bedroom Furniture From the People's Republic of China,73 FR 12387 (March 7, 2008) and Wooden Bedroom Furniture from the People's Republic of China: Initiation of New Shipper Reviews,73 FR 12392 (March 7, 2008). On August 22, 2008, the Department aligned the deadlines and the time limits of the new shipper reviews of WBF with the 2007 administrative review of WBF. See Memorandum to the File “Wooden Bedroom Furniture from the People's Republic of China: Alignment of the 1/1/2007-12/31/2007 Annual Administrative Review and the 1/1/2007-12/31/2007 New Shipper Review,” dated August 22, 2008. The preliminary results of these reviews are currently due no later than October 2, 2008.

Extension of Time Limit of Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue preliminary results within 245 days after the last day of the anniversary month of an order. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the time period to a maximum of 365 days. Completion of the preliminary results of these reviews within the 245-day period is not practicable because the Department needs additional time to analyze information pertaining to the respondents' sales practices, factors of production, and corporate relationships, and to issue and review responses to supplemental questionnaires.

Because it is not practicable to complete these reviews within the time specified under the Act, we are fully extending the time period for issuing the preliminary results of review to 365 days until January 30, 2009, in accordance with section 751(a)(3)(A) of the Act. The final results continue to be due 120 days after the publication of the preliminary results.

This notice is published pursuant to sections 751(a) and 777(i) of the Act.

Dated: September 29, 2008.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

[FR Doc. E8-23566 Filed 10-3-08; 8:45 am]

BILLING CODE 3510-DS-P