This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments must be filed no later than 75 days from the date of publication of this notice in the Federal Register. Comments received after this date will be considered, if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
22
as of
08/12/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission (NRC).
ACTION:
Announcement of issuance for public comment, availability.
SUMMARY:
The Office of Nuclear Security and Incident Response (NSIR) is soliciting public comment on its proposed Interim Staff Guidance (ISG) NSIR/DPR-ISG-01, “Emergency Planning for Nuclear Power Plants.” This ISG would provide guidance for addressing new emergency planning (EP) requirements for nuclear power plants based on proposed changes to EP regulations in Title 10, “Energy,” Part 50, “Domestic Licensing of Production and Utilization Facilities,” of the
Code of Federal Regulations
(10 CFR Part 50), specifically Section 50.47, “Emergency Plans,” and Appendix E, “Emergency Planning and Preparedness for Production and Utilization Facilities” (reference RIN 3150-AI10). The NRC staff will modify the ISG as necessary for consistency with the final EP rule as part of the overall comment resolution process for the ISG and EP rule changes. Additional guidance on topics not directly related to the EP final rule, such
( printed page 23222)
as integrating offsite response methodologies with onsite EP programs, is also provided in the ISG. Once the EP final rule is published and NRC staff completes the ISG, the staff will issue it for use. The NRC staff will incorporate the updated guidance information in NSIR/DPR-ISG-01 into future revisions of NUREG-0654/FEMA-REP-1, “Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,” and other EP guidance documents.
Some NRC EP regulatory requirements are being revised that warrant guidance outside the scope of the proposed ISG. The NRC staff plans to provide additional guidance for addressing proposed changes to Section 50.54(q) concerning emergency plan changes in the form of a new Regulatory Guide (RG), proposed changes to Appendix E to 10 CFR Part 50 regarding emergency action levels for hostile action events in a revision to RG 1.101, “Emergency Planning for Nuclear Power Plants,” and proposed changes to Section 50.47(b)(10) and Appendix E to 10 CFR Part 50 regarding updates to evacuation time estimates in the form of a new NUREG/CR document. The Federal Emergency Management Agency (FEMA) is addressing offsite EP guidance changes in support of the proposed EP rule and other offsite EP program issues in a new supplement to NUREG-0654/FEMA-REP-1, as well as other FEMA documents. These documents will be issued separately for public comment prior to publishing the EP final rule.
DATES:
Comments must be filed no later than 75 days from the date of publication of this notice in the
Federal Register.
Comments received after this date will be considered, if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.
ADDRESSES:
NSIR/DPR-ISG-01, “Emergency Planning for Nuclear Power Plants,” is available for inspection and copying for a fee at the NRC Public Document Room, Public File Area O1-F21, 11555 Rockville Pike, Rockville, Maryland. Publicly available documents created or received at the NRC after November 1, 1999, are available electronically at the NRC's Electronic Reading Room at
http://www.nrc.gov/reading-rm.html.
From this site, the public can gain entry into the NRC's Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS Accession number for this ISG is: ML083540070. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC Public Document Room (PDR) Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail at
pdr.resource@nrc.gov.
Comments will be made available to the public in their entirety; personal information, such as your name, address, telephone number, e-mail address, etc., will not be removed from your submission. You may submit comments by any one of the following methods:
Federal e-Rulemaking Portal:
Go to
http://www.regulations.gov; search on Docket ID: NRC-2008-0122. Direct questions about NRC dockets to Carol Gallagher by telephone at 301-492-3668 or e-mail at
carol.gallagher@nrc.gov. Mail comments to:
Michael T. Lesar, Chief, Rulemaking and Directives Branch, Office of Administration, Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Cite the publication date and page number of this
Federal Register
notice.
FOR FURTHER INFORMATION CONTACT:
Mr. Donald R. Tailleart, Division of Preparedness and Response, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone 301-415-2966 or e-mail at
don.tailleart@nrc.gov.
The NRC staff is issuing this notice to solicit public comments on the proposed NSIR/DPR-ISG-01. After the NRC staff considers any public comments, it will make a determination regarding the proposed NSIR/DPR-ISG-01.
Dated at Rockville, Maryland, this 5th day of May 2009.
For the Nuclear Regulatory Commission.
Melvyn N. Leach,
Director, Division of Preparedness and Response, Office of Nuclear Security and Incident Response.