Circular Welded Non-Alloy Steel Pipe from the Republic of Korea: Extension of Time Limit for Preliminary Results of the Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Joseph Shuler at (202) 482-1293 or Shane Subler at (202) 482-0189; AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On December 24, 2008, the Department published a notice of initiation of administrative review of the antidumping duty order on circular welded non-alloy steel pipe from the Republic of Korea, covering the period November 1, 2007 through October 31, 2008. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 73 FR 79055 (December 24, 2008). The current deadline for the preliminary results of this administrative review is August 2, 2009.

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department of Commerce (“the Department”) to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results of review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Extension of Time Limit for Preliminary Results

The Department requires additional time to review and analyze the sales and cost responses in this administrative review. In particular, one of the respondents in this case has never participated in an antidumping case with the Department, and we need additional time to review its sales and cost methodologies. Thus, it is not practicable to complete this review within the originally anticipated time limit (i.e., by August 2, 2009). Therefore, the Department is extending the time limit for completion of the preliminary results by 120 days to not later than November 30, 2009, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with sections 751(a)(3)(A) of the Act.

Start Signature

Dated: July 14, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. E9-17423 Filed 7-21-09; 8:45 am]