Skip to Content

Notice

Carbazole Violet Pigment 23 From India: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Jerrold Freeman or Richard Rimlinger, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC, 20230; telephone: (202) 482-0180 or (202) 482-4477, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on carbazole violet pigment 23 from India for the period December 1, 2007, through November 30, 2008. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 74 FR 5821 (February 2, 2009).

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an Start Printed Page 45611order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month. See also 19 CFR 351.213(h)(2).

We determine that it is not practicable to complete the preliminary results of this administrative review by the current deadline of September 2, 2009, for several reasons. Specifically, the Department has granted the respondent several extensions to respond to the original and supplemental questionnaires. Accordingly, the Department needs additional time to review and analyze the responses submitted by the respondent. Further, the Department requires additional time to conduct verification. Therefore, in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), we are extending the time period for issuing the preliminary results of these reviews for 75 days until November 16, 2009. The final results continue to be due 120 days after the publication of the preliminary results.

This notice is published in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: August 27, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. E9-21320 Filed 9-2-09; 8:45 am]

BILLING CODE 3510-DS-P