Skip to Content


Mandatory Reliability Standards for the Bulk Power System; Notice of Extension of Time

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble October 1, 2009.

On September 30, 2009, the North American Electric Reliability Corporation (NERC) filed a request for an extension of time to file comments in response to the Commission's September 10, 2009 notice [1] requesting comments on the Topological and Impedance Element Ranking (TIER) Report in the above-docketed proceeding. In its motion, NERC states that it requires additional time to address questions that were raised at a public presentation for the TIER report and to submit responsive comments.

Upon consideration, notice is hereby given that an extension of time for filing comments on the TIER report is granted to and including October 28, 2009.

Start Signature

Kimberly D. Bose,


End Signature End Preamble


1.  Mandatory Reliability Standards for the Bulk Power System, RM06-16-000 (Notice of Public Meeting) (September 10, 2009).

Back to Citation

[FR Doc. E9-24253 Filed 10-7-09; 8:45 am]