Start Preamble October 8, 2009.

The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:

Agency Holding Meeting:

Federal Energy Regulatory Commission.

Date and Time:

October 15, 2009, 10 a.m.

Place:

Room 2C, 888 First Street, NE., Washington, DC 20426.

Status:

Open.

Matters To Be Considered:

Agenda.*

Note

—Items listed on the agenda may be deleted without further notice.

Contact Person For More Information:

Kimberly D. Bose, Secretary, Telephone (202) 502-8400. For a recorded message Start Printed Page 52803listing items struck from or added to the meeting, call (202) 502-8627.

This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.

952nd—Meeting

Regular Meeting [October 15, 2009, 10 a.m.]

Item NoDocket No.Company
Administrative
A-1AD02-1-000Agency Administrative Matters—FERC Strategic Plan.
A-2AD02-7-000Customer Matters, Reliability, Security and Market Operations.
A-3AD06-3-000Winter Energy Market Assessment.
Electric
E-1OA08-52-004New York Independent System Operator, Inc.
OA08-52-006New York Transmission Owners.
E-2OA08-52-005New York Independent System Operator, Inc.
E-3RR09-9-000 RR08-6-004. RR07-14-004.North American Electric Reliability Corporation.
E-4NP09-26-000North American Electric Reliability Corporation.
E-5Omitted.
E-6RM08-12-001Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction.
E-7RM09-23-000Revisions to Form, Procedures, and Criteria for Certification of Qualifying Facility Status for a Small Power Production or Cogeneration Facility.
E-8RM09-24-000Interest Rates for Refunds.
E-9ER06-456-006 ER06-954-002. ER06-1271-001. ER07-424-000. EL07-57-000.PJM Interconnection, L.L.C.
E-10ER08-15-002Midwest ISO Transmission Owners.
E-11Omitted.
E-12Omitted.
E-13ER02-2560-009Louisville Gas & Electric Company Kentucky Utilities Company.
Miscellaneous
M-1RM07-1-001Standards of Conduct for Transmission Providers.
Gas
G-1RP99-480-024 RP09-143-000.Texas Eastern Transmission, LP.
G-2RP09-70-000Texas Eastern Transmission LP.
RP09-71-000Saltville Gas Storage Company L.L.C.
RP09-76-000East Tennessee Natural Gas, L.L.C.
RP09-77-000Egan Hub Storage, L.L.C.
RP09-222-000ANR Pipeline Co.
RP09-227-000Northwest Pipeline GP.
RP09-240-000Natural Gas Pipeline Co. of America.
RP09-245-000Transcontinental Gas Pipeline Co., L.L.C.
RP09-256-000Panhandle Eastern Pipeline Co., LP.
RP09-258-000Quest Pipelines (KPC).
RP09-260-000Tres Palacios Gas Storage, LLC.
RP09-261-000CenterPoint Energy Gas Transmission Co.
RP09-262-000CenterPoint Energy-Mississippi River Transmission Co.
RP09-265-000Kinder Morgan Interstate Gas Transmission LLC.
RP09-266-000Rockies Express Pipeline LLC.
RP09-269-000National Fuel Supply Corp.
RP09-270-000Questar Pipeline Co.
RP09-275-000Columbia Gulf Transmission Co.
RP09-277-000Dominion Transmission, Inc.
RP09-282-000Tennessee Gas Pipeline Co.
RP09-284-000El Paso Natural Gas Co.
RP09-288-000Southern Natural Gas Co.
RP09-294-000Columbia Gas Transmission, LLC.
RP09-295-000Colorado Interstate Gas Co.
RP09-299-000Wyoming Interstate Co., Ltd.
RP09-300-000Cheyenne Plains Gas Pipeline Co., LLC.
Start Printed Page 52804
RP09-301-000Gulf South Pipeline Co., LP.
RP09-304-000Texas Gas Transmission, LLC.
RP09-332-000Enbridge Pipelines (Midla), LLC.
G-3RP09-792-000Columbia Gas Transmission, LLC.
RP09-792-001.
Hydro
H-1P-2130-038Pacific Gas and Electric Company.
H-2Omitted.
H-3P-459-282AmerenUE.
H-4P-2197-096Alcoa Power Generating Inc.
Certificates
C-1CP09-65-000Columbia Gas Transmission, LLC. Jefferson Gas, LLC.
C-2CP09-454-000BCR Holdings, Inc.
C-3CP08-431-001Columbia Gas Transmission LLC
Start Signature

Kimberly D. Bose,

Secretary.

End Signature

A free Web cast of this event is available through http://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to http://www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

End Preamble

[FR Doc. E9-24780 Filed 10-9-09; 4:15 pm]

BILLING CODE 0717-01-P