This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of final results of antidumping duty administrative review, partial rescission of antidumping duty administrative review and revocation of antidumping duty order in part.
Notice of amendment to final determination of sales at less than fair value in accordance with decision upon remand and revocation in part: Certain Pasta from Italy.
Notice of preliminary results and partial rescission of antidumping duty administrative review and intent to revoke the antidumping duty order in part.
Notice of final results of antidumping duty administrative review and determination to revoke the antidumping duty order in part: Certain pasta from Italy.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
18
as of
09/16/2026 at 12:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
FOR FURTHER INFORMATION CONTACT:
Victoria Cho at (202) 482-5075, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW., Washington, DC 20230.
Background
On August 26, 2008, the U.S. Department of Commerce (Department) published a notice of initiation of the administrative review of the antidumping duty order on certain pasta from Italy, covering the period July 1, 2007, to June 30, 2008.
See Initiation of Antidumping and Countervailing Duty Administrative Reviews,73 FR 50308 (August 26, 2008). On August 6, 2009, the Department published the preliminary results of this review.
See Certain Pasta from Italy: Notice of Preliminary Results of Twelfth Antidumping Duty Administrative Review,74 FR 39285 (August 6, 2009).
( printed page 63387)
The final results of this review are currently due no later than December 4, 2009.
Extension of Time Limit of the Final Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (Act), requires the Department to issue the final results of a review within 120 days after the date on which the preliminary results are published. However, if it is not practicable to complete the review within that time period, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the final results to a maximum of 180 days.
See also19 CFR 351.213(h)(2).
We determine that it is not practicable to complete the final results of this review within the original time limit because the Department is considering modifying the model-match methodology, which is a complex issue that requires additional time to adequately analyze. Therefore, the Department is fully extending the final results. The final results are now due not later than February 2, 2010.
This extension is in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).
Dated: November 17, 2009.
John M. Andersen,
Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.