Skip to Content

Notice

Polyethylene Retail Carrier Bags From Malaysia: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

May 7, 2010.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Jerrold Freeman or Richard Rimlinger, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC, 20230; telephone: (202) 482-0180 or (202) 482-4477, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on polyethylene retail carrier bags from Malaysia for the period August 1, 2008, through July 31, 2009. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 74 FR 48224 (September 22, 2009).

As explained in the memorandum from the Deputy Assistant Secretary for Import Administration, we have exercised our discretion to toll deadlines for the duration of the closure of the Federal Government from February 5 through February 12, 2010. Thus, all deadlines in this review have been extended by seven days. The revised deadline for the final results of this administrative review is currently May 10, 2010. See Memorandum to the Record from Ronald Lorentzen, DAS for Import Administration, regarding “Tolling of Administrative Deadlines As a Result of the Government Closure During the Recent Snowstorm,” dated February 12, 2010. Start Printed Page 25208

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month. See also 19 CFR 351.213(h)(2).

We determine that it is not practicable to complete the preliminary results of this administrative review by the current deadline of May 10, 2010, because we are continuing to examine the operating status of the sole respondent, Europlastics Malaysia Sdn. Bhd. Therefore, in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), we are partially extending the time period for issuing the preliminary results of this review by 30 days until June 9, 2010.

This notice is published in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: May 3, 2010.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2010-10869 Filed 5-6-10; 8:45 am]

BILLING CODE 3510-DS-S