Polyethylene Retail Carrier Bags From Thailand: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: June 25, 2010.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Thomas Schauer, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-0410.

Background

On August 9, 2004, the Department of Commerce (the Department) published in the Federal Register the antidumping duty order on polyethylene retail carrier bags from Thailand. See Antidumping Duty Order: Polyethylene Retail Carrier Bags From Thailand, 69 FR 48204 (August 9, 2004). On September 22, 2009, we published a notice of initiation Start Printed Page 36360of an administrative review of the order with respect to six companies. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 74 FR 48224, 48226 (September 22, 2009).[1] The period of review is August 1, 2008, through July 31, 2009.

As explained in the February 12, 2010, memorandum from the Deputy Assistant Secretary for Import Administration, the Department has exercised its discretion to toll Import Administration deadlines for the duration of the closure of the Federal Government from February 5 through February 12, 2010. Thus, the deadline in this segment of the proceeding has been extended by seven days. As a result, the revised deadline for the preliminary results of this administrative review became May 10, 2010. See Memorandum to the Record from Ronald Lorentzen, DAS for Import Administration, regarding “Tolling of Administrative Deadlines As a Result of the Government Closure During the Recent Snowstorm,” dated February 12, 2010.

On May 4, 2010, we extended the time period for issuing the preliminary results of this review by 50 days to June 29, 2010. See Polyethylene Retail Carrier Bags from Thailand: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review, 75 FR 23673 (May 4, 2010).

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published in the Federal Register. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of this review by the current deadline of June 29, 2010, because we require additional time to analyze a number of complex cost-accounting issues relating to this administrative review that have been raised by parties to the proceeding. Therefore, in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), we are extending the time period for issuing the preliminary results of this review by an additional 58 days to August 26, 2010.

This notice is published in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act.

Start Signature

Dated: June 21, 2010.

Gary Taverman,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Further Info End Preamble

Footnotes

1.  The review covers the following companies: C.P. Packaging Co., Ltd., Giant Pack Co., Ltd., Landblue (Thailand) Co., Ltd., Sahachit Watana Plastics Ind. Co., Ltd., Thai Plastic Bags Industries Co., Ltd., and Thantawan Industry Public Co., Ltd. Id. The Department has determined previously that Thai Plastic Bags Industries Co., Ltd., APEC Film Ltd., and Winner's Pack Co., Ltd., comprise the Thai Plastic Bags Group. See Notice of Final Determination of Sales at Less Than Fair Value: Polyethylene Retail Carrier Bags From Thailand, 69 FR 34122, 34123 (June 18, 2004).

Back to Citation

[FR Doc. 2010-15503 Filed 6-24-10; 8:45 am]

BILLING CODE 3510-DS-P