Skip to Content

Notice

Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.

ACTION:

List of applications delayed more than 180 days.

SUMMARY:

In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Delmer F. Billings, Director, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building, PHH-30, 1200 New Jersey Avenue, Southeast, Washington, DC 20590-0001, (202) 366-4535.

Key to “Reason for Delay”

1. Awaiting additional information from applicant.

2. Extensive public comment under review.

3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis.

4. Staff review delayed by other priority issues or volume of special permit applications.

Meaning of Application Number Suffixes

N—New application.

M—Modification request.

PM—Party to application with modification request.

Start Signature

Issued in Washington, DC, on August 18, 2010.

Donald Burger,

Chief, Special Permits and Approvals Branch.

End Signature Start Printed Page 52058
Application No.ApplicantReason for delayEstimated date of completion
Modification to Special Permits
14167-MTrinityrail, Dallas, TX403-31-2011
6293-MATK Space Systems, Inc. (Former Grantee: ATK Thiokol, Inc.), Corine, UT403-31-2011
14741-MWeatherford International, Fort Worth, TX403-31-2011
8826-MPhoenix Air Group, Inc., Cartersville, GA403-31-2011
14650-MAir Transport International, L.L.C., Little Rock, AR403-31-2011
14926-MLynden Air Cargo, Anchorage, AK411-30-2010
14808-MAmtrol, Inc., West Warwick, RI403-31-2011
8826-MPhoenix Air Group, Inc., Cartersville, GA403-31-2011
10869-MNorris Cylinder Company, Longview, TX403-31-2011
13736-MConocoPhillips, Anchorage, AK403-31-2011
New Special Permit Applications
14810-NOlin Corporation, Chlor Alkai Products Division, Cleveland, TN403-31-2011
14813-NOrgan Recovery Systems, Des Plaines, IL403-31-2011
14832-NTrinity Industries, Inc., Dallas, TX403-31-2011
14835-NThe Reusable Industrial Packaging Assoc., Washington, DC403-31-2011
14839-NMatheson Tri-Gas, Inc., Basking Ridge, NJ311-30-2010
14851-NAlaska Air Group, Inc., Seattle, WA403-31-2011
14868-NWal-Mart Stores, Inc., Bentonville, AR403-31-2011
14878-NHumboldt County Waste Management Authority, Eureka, CA403-31-2011
14872-NArkema, Inc., Philadelphia, PA403-31-2011
14921-NERA Helicopters LLE, Lake Charles, LA411-30-2010
14899-NMGH Management Group, LLC403-31-2011
14929-NAlaska Island Air, Inc., Togiak, AK411-30-2010
14933-NTobin Scientific, a division of Tobin & Sons Moving and Storage, Inc., Peabody, MA403-31-2011
14940-NCrown Aerosol Packaging, Philadelphia, PA411-30-2010
14945-NVulcan Construction Materials LP SE, db/a Vulcan Materials Company, Atlanta, GA403-31-2011
14951-NLincoln Composites, Lincoln, NE111-30-2010
14952-NMebrom NV, Ertvelde-Rieme111-30-2010
14960-NCheltec, Inc., Sarasota, FL403-31-2011
14965-NJiangXi Oxygen Plant Co., Ltd., Jiangxi Province411-30-2010
14972-NAir Products and Chemicals, Allentown, PA411-30-2010
14977-NAir Products and Chemicals, Inc., Allentown, PA403-31-2011
14980-NBoehlke Bottled Gas Corp., Cedarburg, WI403-31-2011
End Further Info End Preamble

[FR Doc. 2010-20911 Filed 8-23-10; 8:45 am]

BILLING CODE 4910-60-M