Skip to Content

Notice

Critical Path Transmission, LLC; Clear Power, LLC; v. California Independent System Operator, Inc.; Notice of Complaint

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble December 17, 2010.

Take notice that on December 14, 2010, pursuant to Rule 206 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206 (2010) and sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2006), Critical Path Transmission, LLC and Clear Power LLC (Complainants) filed a complaint against California Independent System Operator, Inc. (CAISO or Respondent), alleging a violation of the CAISO tariff, as more fully explained in the complaint.

Complainants state that copies of the complaint were served upon Respondent.

Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent's answer and all interventions, or protests must be filed on or before the comment date. The Respondent's answer, motions to intervene, and protests must be served on the Complainants.

The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

This filing is accessible on-line at http://www.ferc.gov, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Comment Date: 5 p.m. Eastern Time on January 3, 2011.

Start Signature

Kimberly D. Bose,

Secretary.

End Signature End Preamble

[FR Doc. 2010-32362 Filed 12-23-10; 8:45 am]

BILLING CODE 6717-01-P