Skip to Content

Notice

Certain Polyester Staple Fiber From Taiwan: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: January 31, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Michael A. Romani, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-0198.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on certain polyester staple fiber from Taiwan for the period May 1, 2009, through April 30, 2010. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 75 FR 37759 (June 30, 2010). The preliminary results are currently due no later than January 31, 2011.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published in the Federal Register. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of this review by the current deadline of January 31, 2011, because we require additional time to obtain additional information concerning the respondent's U.S. and home-market sales. Therefore, in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), we are extending the time period for issuing the preliminary results of this review by 74 days to April 15, 2011.

This notice is published in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act.

Start Signature

Dated: January 24, 2011.

Christian Marsh,

Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-1938 Filed 1-28-11; 8:45 am]

BILLING CODE 3510-DS-P