Legal Status
Legal Status
Notice
Qualified Hydro 34, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
A Notice by the Federal Energy Regulatory Commission on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 03/01/2011
- Agencies:
- Federal Energy Regulatory Commission
- Document Type:
- Notice
- Document Citation:
- 76 FR 11240
- Page:
- 11240 (1 page)
- Agency/Docket Number:
- Project No. 13870-000
- Document Number:
- 2011-4415
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
There is no table of contents available for this document.Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/2011-4415 https://www.federalregister.gov/d/2011-4415
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
On October 15, 2010, Qualified Hydro 34, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Foster Joseph Sayers Dam Hydroelectric Project to be located on Bald Eagle Creek in the vicinity of Liberty Township in Centre County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
The proposed project would utilize the existing U.S. Army Corps of Engineers' Foster Joseph Sayers Dam and would consist of the following: (1) One vertical Kaplan turbine and generator unit rated at 25-megawatts; (2) a 40- by 50-foot powerhouse; (3) a 100-foot-long steel-lined penstock; (4) a 6,600-foot-long transmission line; and (5) appurtenant facilities. The estimated annual generation of the Foster Joseph Sayers Dam Hydroelectric Project would be 12 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Chief Operating Officer, Free Flow Power, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 283-2822.
FERC Contact: Brandi Sangunett (202) 502-8393.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13870-000) in the docket number field to access the document. For assistance, contact FERC Online Support.
Start SignatureDated: February 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-4415 Filed 2-28-11; 8:45 am]
BILLING CODE 6717-01-P