This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
28
as of
11/11/2026 at 2:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
DATES:
Effective Date:
March 9, 2011.
FOR FURTHER INFORMATION CONTACT:
Elfi Blum or Toni Page, AD/CVD Operations, Office 6, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230;
telephone:
(202) 482-0197 or (202) 482-1398, respectively.
Background
On December 21, 2010, the Department of Commerce (the Department) issued the preliminary results of the new shipper review under the antidumping duty order on polyethylene terephthalate film, sheet and strip from India for SRF Limited (SRF) covering the period July 1, 2009, through December 31, 2009.
See Polyethylene Terephthalate Film, Sheet and Strip from India: Preliminary Results of Antidumping Duty New Shipper Review,75 FR 81570 (December 28, 2010) (
Preliminary Results). The final results of review are currently due March 21, 2011.
Statutory Time Limits
Section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended (the Act), and 19 CFR 351.214(i)(1), provide that the Department will issue the preliminary results of a new shipper review of an antidumping duty order within 180 days after the day on which the review was initiated, and the final results of review within 90 days after the date on which the preliminary results were issued. However, if the Department concludes that a new shipper review is extraordinarily complicated, the Department may extend the 180-day period to 300 days, and the 90-day period to 150 days.
See19 CFR 351.214(i)(2).
Extension of Time Limit for Final Results
The Department determines that this new shipper review is extraordinarily complicated because of questions that arose after the
Preliminary Results
concerning the
bona fides
of the new
( printed page 12938)
shipper sale. Due to this issue, the Department had to issue another supplemental questionnaire to SRF, provide SRF with time to respond, and now must analyze SRF's response. Therefore, in accordance with section 751(a)(2)(B)(iv) of the Act and 19 CFR 351.214(i)(2), the Department is extending the time limit for the final results from 90 days to 150 days. Thus, the final results will now be due no later than May 20, 2011.
We are issuing and publishing this notice in accordance with sections 751(a)(2)(B)(iv) and 777(i)(I) of the Act.
Dated: March 3, 2011.
Christian Marsh,
Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.