Skip to Content

Notice

Solid Urea From the Russian Federation: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: March 29, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Dustin Ross, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-0747.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on solid urea from the Russian Federation for the period July 1, 2009, through June 30, 2010. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Deferral of Initiation of Administrative Review, 75 FR 53274 (August 31, 2010). The preliminary results of this administrative review are currently due no later than April 2, 2011.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results within 120 days after the date on which the preliminary results are published in the Federal Register. If it is not practicable Start Printed Page 17381to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of this review by the current deadline of April 2, 2011, because we require additional time to analyze a complex affiliation issue pertaining to the exporter subject to this administrative review. Therefore, we are extending the time period for issuing the preliminary results of this review by 75 days to June 16, 2011.

This notice is published in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: March 23, 2011.

Gary Taverman,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-7361 Filed 3-28-11; 8:45 am]

BILLING CODE 3510-DS-P