Skip to Content

Notice

Corrosion-Resistant Carbon Steel Flat Products From the Republic of Korea: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: April 14, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Gayle Longest, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-3338.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On August 17, 1993, the Department published in the Federal Register the countervailing duty order on corrosion-resistant carbon steel flat products (CORE) from Korea. See Countervailing Duty Orders and Amendments of Final Affirmative Countervailing Duty Determinations: Certain Steel Products from Korea, 58 FR 43752 (August 17, 1993). On August 2, 2010, the Department published a notice of “Opportunity to Request Administrative Review” of this countervailing duty order. See Antidumping or Countervailing Duty Order, Finding, or Suspended Investigation; Opportunity to Request Administrative Review, 75 FR 45094 (August 2, 2010). In accordance with 19 CFR 351.221(c)(1)(i), we published a notice of initiation of the administrative review on September 29, 2010, for the January 1, 2009, through December 31, 2009, period of review (POR). See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 75 FR 60076 (September 29, 2010). The preliminary results for this review are currently due no later than May 3, 2011.

Extension of Time Limits for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results of review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Because the Department will require additional time to review and analyze supplemental information expected from the Government of Korea and the respondent, Hyundai HYSCO Ltd., and may issue further supplemental questionnaires, it is not practicable to complete this review by the original deadline (i.e., May 3, 2011). Therefore, the Department is extending the time limit for completion of the preliminary results by 120 days to not later than August 31, 2011, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.

Start Signature

Dated: April 8, 2011.

Gary Taverman,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-9111 Filed 4-13-11; 8:45 am]

BILLING CODE 3510-DS-P