Skip to Content

Notice

Freshwater Crawfish Tail Meat From the People's Republic of China: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: July 20, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Dmitry Vladimirov, AD/CVD Operations, Office 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-0665.

End Further Info End Preamble Start Supplemental Information Start Printed Page 43261

SUPPLEMENTARY INFORMATION:

Background

On October 28, 2010, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on freshwater crawfish tail meat from the People's Republic of China (PRC) for the period September 1, 2009, through August 31, 2010. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 75 FR 66349 (October 28, 2010). We initiated an administrative review of six companies. On February 28, 2011, we rescinded the review of the order with respect to Yancheng Hi-King. See Freshwater Crawfish Tail Meat From the People's Republic of China: Rescission of Antidumping Duty Administrative Review in Part, 76 FR 10879 (February 28, 2011). On June 6, 2011, we extended the time period for issuing the preliminary results of this review by 46 days until July 18, 2011. See Freshwater Crawfish Tail Meat From the People's Republic of China: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review, 76 FR 32357 (June 6, 2011).

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of this review within the extended time limit because we require additional time to analyze the allegation of middleman dumping and the record information pertaining to the allegation. In addition, the numerous extensions requested by, and granted to, the interested parties for filing various responses has contributed to the Department's need for additional time to complete the preliminary results. Therefore, we are extending the time period for issuing the preliminary results of this review by an additional 74 days until September 30, 2011.

This notice is published in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: July 13, 2011.

Christian Marsh,

Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-18302 Filed 7-19-11; 8:45 am]

BILLING CODE 3510-DS-P