This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Hand Trucks and Certain Parts Thereof From the People's Republic of China; Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Hand Trucks and Certain Parts Thereof From the People's Republic of China; Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
23
as of
08/07/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
DATES:
Effective Date:
September 6, 2011.
FOR FURTHER INFORMATION CONTACT:
John Drury or Angelica Mendoza, AD/CVD Operations, Office 7, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-0195 or (202) 482-3019, respectively.
SUPPLEMENTARY INFORMATION:
Background
On January 28, 2011, the Department of Commerce (the Department) published in the
Federal Register
the initiation of administrative review of the antidumping duty order on hand trucks and certain parts thereof from the People's Republic of China, covering the period December 1, 2009, to November 30, 2010.
See Initiation of Antidumping and Countervailing Duty Administrative Reviews,76 FR 5137 (January 28, 2011). The current deadline for the preliminary results of this review is September 2, 2011.
Scope of the Order
The merchandise subject to this antidumping duty order consists of hand trucks manufactured from any material, whether assembled or unassembled, complete or incomplete, suitable for any use, and certain parts thereof, namely the vertical frame, the handling area and the projecting edges or toe plate, and any combination thereof. A complete or fully assembled hand truck is a hand-propelled barrow consisting of a vertically disposed frame having a handle or more than one handle at or near the upper section of the vertical frame; at least two wheels at or near the lower section of the vertical frame; and a horizontal projecting edge or edges, or toe plate, perpendicular or angled to the vertical frame, at or near the lower section of the vertical frame. The projecting edge or edges, or toe plate, slides under a load for purposes of lifting and/or moving the load.
That the vertical frame can be converted from a vertical setting to a horizontal setting, then operated in that horizontal setting as a platform, is not a basis for exclusion of the hand truck from the scope of this petition. That the vertical frame, handling area, wheels, projecting edges or other parts of the hand truck can be collapsed or folded is not a basis for exclusion of the hand truck from the scope of the petition. That other wheels may be connected to the vertical frame, handling area, projecting edges, or other parts of the hand truck, in addition to the two or
( printed page 55012)
more wheels located at or near the lower section of the vertical frame, is not a basis for exclusion of the hand truck from the scope of the petition. Finally, that the hand truck may exhibit physical characteristics in addition to the vertical frame, the handling area, the projecting edges or toe plate, and the two wheels at or near the lower section of the vertical frame, is not a basis for exclusion of the hand truck from the scope of the petition.
Examples of names commonly used to reference hand trucks are hand truck, convertible hand truck, appliance hand truck, cylinder hand truck, bag truck, dolly, or hand trolley. They are typically imported under heading 8716.80.50.10 of the Harmonized Tariff Schedule of the United States (HTSUS), although they may also be imported under heading 8716.80.50.90. Specific parts of a hand truck, namely the vertical frame, the handling area and the projecting edges or toe plate, or any combination thereof, are typically imported under heading 8716.90.50.60 of the HTSUS. Although the HTSUS subheadings are provided for convenience and customs purposes, the Department's written description of the scope is dispositive.
Excluded from the scope are small two-wheel or four-wheel utility carts specifically designed for carrying loads like personal bags or luggage in which the frame is made from telescoping tubular materials measuring less than
5/8
inch in diameter; hand trucks that use motorized operations either to move the hand truck from one location to the next or to assist in the lifting of items placed on the hand truck; vertical carriers designed specifically to transport golf bags; and wheels and tires used in the manufacture of hand trucks.
Extension of Time Limits for Preliminary Results of Review
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires that the Department complete the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month of an order for which a review is requested.
The Department finds that it is not practicable to complete the preliminary results of this review within the original time frame because comments from interested parties have necessitated the solicitation and subsequent analysis of additional information from the respondent, New-Tec Integration (Xiamen) Co., Ltd. This additional information covers a wide range of issues and is extensive. The Department requires additional time to gather and analyze the additional information. Thus, the Department finds it is not practicable to complete this review within the original time limit (
i.e.,
September 2, 2011). Accordingly, the Department is extending the time limit for completion of the preliminary results of this administrative review by 120 days (
i.e.,
until January 3, 2012),[1]
in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2). We intend to issue the final results no later than 120 days after publication of the preliminary results notice.
This extension is issued and published in accordance with sections 751(a)(3)(A) and 777(i) of the Act.
Dated: August 30, 2011.
Susan H. Kuhbach,
Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.
Footnotes
1.
The current deadline for the preliminary results of this review is December 31, 2011. As this date falls on Saturday, a non-business day, the preliminary results are due January 3, 2012.
See
Notice of Clarification: Application of “Next Business Day” Rule for Administrative Determination Deadlines Pursuant to the Tariff Act of 1930, as Amended, 70 FR 24533 (May 10, 2005).