Skip to Content

Notice

Diamond Sawblades and Parts Thereof From the People's Republic of China: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: October 19, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Yang Jin Chun, AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-5760.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

At the request of interested parties, the Department of Commerce (the Department) initiated an administrative review of the antidumping duty order on diamond sawblades and parts thereof from the People's Republic of China for the period January 23, 2009, through October 31, 2010. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 75 FR 81565 (December 28, 2010). On July 15, 2011, we extended the due date for the completion of the preliminary results of review by 85 days. See Diamond Sawblades and Parts Thereof from the People's Republic of China: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review, 76 FR 41759 (July 15, 2011). The preliminary results of the review are currently due no later than October 26, 2011.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month.

We determine that it is not practicable to complete the preliminary results of this review within the original time limit because of the complexity of issues involving the selection of surrogate country and surrogate values and because of the extensions we have granted at the request of various parties during the course of the review to submit information to the record. Therefore, we are extending the time period for issuing the preliminary results of this review by 35 days until November 30, 2011.

This notice is published in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: October 12, 2011.

Christian Marsh,

Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-27081 Filed 10-18-11; 8:45 am]

BILLING CODE 3510-DS-P