Skip to Content

Notice

Certain Cut-to-Length Carbon-Quality Steel Plate From the Republic of Korea: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: October 19, 2011.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Yang Jin Chun, AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-5760.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

In response to a request of an interested party, the Department of Commerce (the Department) is conducting an administrative review of the antidumping duty order on certain cut-to-length carbon-quality steel plate from the Republic of Korea. The period of review is February 1, 2010, through January 31, 2011. See Initiation of Antidumping Duty Administrative Reviews, Requests for Revocation in Part, and Deferral of Administrative Review, 76 FR 17825 (March 31, 2011). The preliminary results of the review are currently due no later than October 31, 2011.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month.Start Printed Page 64897

We determine that it is not practicable to complete the preliminary results of this review within the original time limit because of the complexity of the issues concerning the respondent's cost information. Therefore, we are extending the time period for issuing the preliminary results of this review by 70 days until January 9, 2012.

This notice is published in accordance with section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2).

Start Signature

Dated: October 12, 2011.

Christian Marsh,

Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. 2011-27084 Filed 10-18-11; 8:45 am]

BILLING CODE 3510-DS-P