Skip to Content

Notice

Published Document: 2011-28324 (76 FR 67418)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

Effective Date: November 1, 2011.

SUMMARY:

The Department of Commerce (the “Department”) has decided to extend the time limit for the preliminary results of the new shipper review (“NSR”) of the antidumping duty order on certain frozen warmwater shrimp (“shrimp”) from the Socialist Republic of Vietnam (“Vietnam”) to December 9, 2011. The period of review (“POR”) for this NSR is February 1, 2010, through January 31, 2011.

FOR FURTHER INFORMATION CONTACT:

Susan Pulongbarit or Seth Isenberg, AD/CVD Operations, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230; telephone: (202) 482-4031 and (202) 482-0588, respectively.

SUPPLEMENTARY INFORMATION:

Background

The notice announcing the antidumping duty order on shrimp from Vietnam was published in the Federal Register on February 1, 2005.[1] On February 28, 2011, pursuant to section 751(a)(2)(B)(i) of the Tariff Act of 1930, as amended (the “Act”), and section 351.214(c) of the Department's regulations, the Department received a NSR request from Thong Thuan Company Limited and its subsidiary company, Thong Thuan Seafood Company Limited (collectively, “Thong Thuan”). Thong Thuan certified that it is a producer and exporter of the subject merchandise upon which the request was based. The notice initiating the NSR was published on March 23, 2011.[2] The Department extended the time limit for the preliminary results by 60 days on September 7, 2011.[3] The preliminary results are currently due no later than October 9, 2011.

Statutory Time Limits

Section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended (the “Act”), provides that the Department will issue the preliminary results of a new shipper review of an antidumping duty order within 180 days after the day on which the review was initiated. See also19 CFR 351.214(i)(1). The Act further provides that the Department may extend that 180-day period to 300 days if it determines that the case is extraordinarily complicated. See also19 CFR 351.214(i)(2).

Extension of Time Limit of Preliminary Results

The Department determines that this new shipper review involves extraordinarily complicated methodological issues, including Thong Thuan's multiple production stages for subject merchandise and the need to evaluate the bona fide nature of Thong Thuan's sales. The Department finds that these extraordinarily complicated issues require additional time to evaluate. Therefore, in accordance with section 751(a)(2)(B)(iv) of the Act and 19 CFR 351.214(i)(2), the Department is extending the time limit for the preliminary results by an additional 30 days, until no later than December 9, 2011. The final results continue to be due 90 days after the publication of the preliminary results.

We are issuing and publishing this notice in accordance with sections 751(a)(2)(B)(iv) and 777(i) of the Act.

Dated: October 26, 2011.

Christian Marsh,

Deputy Assistant Secretary of Antidumping and Countervailing Duty Operations.

Footnotes

1.   See Notice of Amended Final Determination of Sales at Less Than Fair Value and Antidumping Duty Order: Certain Frozen Warmwater Shrimp from the Socialist Republic of Vietnam,70 FR 5152 (February 1, 2005).

Back to Citation

2.   See Certain Frozen Warmwater Shrimp from the Socialist Republic of Vietnam: Initiation of Antidumping Duty New Shipper Review,76 FR 16384 (March 23, 2011).

Back to Citation

3.   See Certain Frozen Warmwater Shrimp From the Socialist Republic of Vietnam: Extension of Time Limit for the Preliminary Results of the New Shipper Review,76 FR 55350 (September 7, 2011).

Back to Citation

[FR Doc. 2011-28324 Filed 10-31-11; 8:45 am]

BILLING CODE 3510-DS-P