Skip to Content

During the funding lapse, Federalregister.gov is not being supported. If data feeds are not available from GPO, FederalRegister.gov will not be updated, so please use the official edition of the Federal Register on Govinfo (https://www.govinfo.gov/app/collection/fr). If there is a technical issue with the Public Inspection List, you can view the documents on public inspection at our office in Washington, DC or on archives.gov.

Notice

Corrosion-Resistant Carbon Steel Flat Products From the Republic of Korea: Extension of Time Limit for the Preliminary Results of Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

FOR FURTHER INFORMATION CONTACT:

Cindy Robinson, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230; telephone: (202) 482-3797.

Background

On October 3, 2011, the U.S. Department of Commerce (“Department”) published a notice of initiation of the administrative review of the antidumping duty order on corrosion-resistant carbon steel flat products from the Republic of Korea, covering the period August 1, 2010, to July 31, 2011. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 76 FR 61076 (October 3, 2011). The preliminary results of this review are currently due no later than May 2, 2012.

Extension of Time Limit of Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires that the Department make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested. Section 751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results to up to 365 days.

We determine that completion of the preliminary results of this review within the 245-day period is not practicable. Additional time is needed to gather and analyze a significant amount of information pertaining to sales practices, manufacturing costs and corporate relationships pertaining to each company participating in the review. Given the number and complexity of issues in this case, in accordance with section 751(a)(3)(A) of the Act, we are fully extending by 120 days the time period for issuing the preliminary results of review. Therefore, the preliminary results are now due no later than August 30, 2012. The final results continue to be due 120 days after publication of the preliminary results.

This notice is published pursuant to sections 751(a)(3)(A) and 777(i)(1) of the Act.

Dated: April 24, 2012.

Gary Taverman,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

[FR Doc. 2012-10350 Filed 4-27-12; 8:45 am]

BILLING CODE 3510-DS-P