This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Proposed Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments and related material must be received by the Coast Guard on or before October 5, 2012.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
357
as of
11/16/2026 at 2:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2012-21760 as it appeared on Public Inspection on
09/04/2012 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2012-21760 (77 FR 54495)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of proposed rulemaking.
SUMMARY:
The Coast Guard proposes to establish a regulated navigation area (RNA) on the navigable waters of the Thames River in New London Harbor, New London, CT. The proposed RNA would establish speed and wake restrictions as well as allow the Coast Guard to prohibit all vessel traffic through the RNA during degaussing range replacement operations, both planned and unforeseen, that could pose an imminent hazard to persons and vessels operating in the area. This rule is necessary to provide for the safety of life on the navigable waters during the replacement of the degaussing range and its supporting system.
DATES:
Comments and related material must be received by the Coast Guard on or before October 5, 2012.
Requests for public meetings must be received by the Coast Guard on or before September 17, 2012.
ADDRESSES:
You may submit comments identified by docket number using any one of the following methods:
(3)
Mail or Delivery:
Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590-0001. Deliveries accepted between 9 a.m. and 5 p.m., Monday through Friday, except federal holidays. The telephone number is 202-366-9329.
See the “Public Participation and Request for Comments” portion of the
SUPPLEMENTARY INFORMATION
section below for further instructions on submitting comments. To avoid duplication, please use only one of these three methods.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email Petty Officer Joseph Graun, Prevention Department, U.S. Coast Guard Sector Long Island Sound, (203) 468-4544,
Joseph.L.Graun@uscg.mil;
or
( printed page 54496)
Lieutenant Isaac M. Slavitt, Waterways Management, U.S. Coast Guard First District, (617) 223-8385. If you have questions on viewing or submitting material to the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION:
Table of Acronyms
COTP Captain of the Port
DHS Department of Homeland Security
FR
Federal Register
NPRM Notice of Proposed Rulemaking
RNA Regulated Navigation Area
A. Public Participation and Request for Comments
We encourage you to participate in this rulemaking by submitting comments and related materials. All comments received will be posted without change to
http://www.regulations.gov
and will include any personal information you have provided.
1. Submitting Comments
If you submit a comment, please include the docket number for this rulemaking, indicate the specific section of this document to which each comment applies, and provide a reason for each suggestion or recommendation. You may submit your comments and material online at
http://www.regulations.gov,
or by fax, mail, or hand delivery, but please use only one of these means. If you submit a comment online, it will be considered received by the Coast Guard when you successfully transmit the comment. If you fax, hand deliver, or mail your comment, it will be considered as having been received by the Coast Guard when it is received at the Docket Management Facility. We recommend that you include your name and a mailing address, an email address, or a telephone number in the body of your document so that we can contact you if we have questions regarding your submission.
To submit your comment online, go to
http://www.regulations.gov,
type the docket number (USCG-2012-0623) in the “SEARCH” box and click “SEARCH.” Click on “Submit a Comment” on the line associated with this rulemaking.
If you submit your comments by mail or hand delivery, submit them in an unbound format, no larger than 8
1/2
by 11 inches, suitable for copying and electronic filing. If you submit comments by mail and would like to know that they reached the Facility, please enclose a stamped, self-addressed postcard or envelope. We will consider all comments and material received during the comment period and may change the rule based on your comments.
2. Viewing Comments and Documents
To view comments, as well as documents mentioned in this preamble as being available in the docket, go to
http://www.regulations.gov,
type the docket number (USCG-2012-0623) in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this rulemaking. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
3. Privacy Act
Anyone can search the electronic form of comments received into any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted on behalf of an association, business, labor union, etc.). You may review a Privacy Act notice regarding our public dockets in the January 17, 2008, issue of the
Federal Register
(73 FR 3316).
4. Public Meeting
We do not now plan to hold a public meeting. But you may submit a request for one on or before September 17, 2012, using one of the methods specified under
ADDRESSES
. Please explain why you believe a public meeting would be beneficial. If we determine that one would aid this rulemaking, we will hold one at a time and place announced by a later notice in the
Federal Register
.
B. Basis and Purpose
Under the Ports and Waterways Safety Act, the Coast Guard has the authority to establish RNAs in defined water areas that are determined to have hazardous conditions and in which vessel traffic can be regulated in the interest of safety. See 33 U.S.C. 1231 and Department of Homeland Security Delegation No. 0170.1.
This proposal would establish speed and wake restrictions as well as allow the Coast Guard to prohibit all vessel traffic through the RNA during degaussing range replacement operations, both planned and unforeseen, that could pose an imminent hazard to persons and vessels operating in the area. The Coast Guard is not now planning (and will actively avoid) full closures of the waterway; however, given the nature of the work it is important that this regulatory tool be available if circumstances change. This rule is necessary to provide for the safety of life on the navigable waters during the replacement of the degaussing range and its supporting system.
C. Discussion of Proposed Rule
The U.S. Navy operates a fixed degaussing range in New London Harbor, New London, CT. This range is buried in sand on the bottom of the Thames River federal navigation channel southeast of Fort Trumbull State Park. The Navy uses this range to decrease unwanted magnetic fields in Navy vessels. On NOAA Charts, the degaussing range is outlined with a black dotted line and labeled “Degaussing Range”. The associated system of sensors and cables encompasses a much larger area of the river bottom, from the river's west shore by Fort Trumbull State Park southeasterly across the river to the river's eastern bank. On NOAA Charts, this supporting system's boundaries are outlined with a magenta dotted line and labeled “Cable Area”. The Navy is preparing to replace this range with new sensors, cables and supporting equipment. The replacement project is projected to last between four and six months, and is scheduled to begin on or about November 1, 2012.
The Coast Guard is not now planning (and will actively avoid) full closures of the waterway; however, given the nature of the work it is important that this regulatory tool be available if circumstances change. The Coast Guard attended the project's “95% Design Review Meeting” hosted by the U.S. Navy on April 17, 2012 in New London, CT. During the meeting, the Navy presented the project design and an overview of what operations must take place in order to complete the project. The Coast Guard discussed this project with the Navy to identify whether the project can be completed without channel closures. While the majority of the project will be completed without the need for full closures, the possibility remains that certain tasks will require closing the waterway due to the location of the degaussing range directly under the navigation channel.
The new trench will be located adjacent to the current degaussing range within the navigation channel. Excavating the trench and replacing equipment and cables will require barges and equipment to take up a portion of the channel while they perform various operations including excavating, diving, laying cables, and placing sensors. This process will be
( printed page 54497)
extremely complex and involves many safety hazards. In order to minimize safety hazards, the Coast Guard proposes to make the “Cable Area” (which includes the “Degaussing Range”) a temporary RNA.
This RNA would allow the Captain of the Port Sector Long Island Sound (COTP) to establish speed and wake restrictions and to prohibit vessel traffic on this portion of the river for limited periods when necessary for the safety of vessels and workers during construction work in the channel. The Coast Guard would enforce a five knot speed limit and “NO WAKE” zone and be able to close the designated area to all vessel traffic during any circumstance, planned or unforeseen, that poses an imminent threat to waterway users or construction operations in the area. Complete waterway closures would be minimized to that period absolutely necessary and made with as much advanced notice as possible.
Entry into, anchoring or movement within this proposed RNA during a closure would be prohibited unless authorized by the COTP or a designated representative. In the event of an emergency, all construction equipment would need to be vacated for emergency vessels (i.e. Fire Rescue Boat, Marine Police Boat, or Environmental Response Boat).
This project is expected to be completed within a four to six month period. However, in order to prepare for project delays associated with inclement weather, permitting and other circumstance we propose a twenty-four month effective period for the RNA from November 1, 2012 until October 31, 2014.
The project currently faces several factors that could lead to delays. A project coordinator has not yet been identified. Additionally, as of July 2012 state environmental and Army Corps of Engineers permits have not been requested by the Navy. These permits can take several months to obtain and once obtained may include restrictions on certain underwater activities. The Navy will not know the extent of all restrictions until the permits are issued.
If the project is completed before October 31, 2014, the COTP could suspend enforcement of the RNA. The COTP would ensure that notice of the suspension of enforcement reached affected segments of the public by all appropriate means. Such means of notification could include, but would not be limited to, Broadcast Notice to Mariners and Local Notice to Mariners.
D. Regulatory Analyses
We developed this proposed rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes or executive orders.
1. Regulatory Planning and Review
This proposed rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Executive Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders.
The Coast Guard determined that this rulemaking would not be a significant regulatory action for the following reasons: vessel traffic would only be excluded from the RNA for limited durations (if at all), and speed and wake restrictions are not unduly restrictive, and the RNA covers a small geographic area. Advanced public notifications would also be made to local mariners through appropriate means, which could include, but would not be limited to, Local Notice to Mariners and Broadcast Notice to Mariners.
2. Impact on Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered the impact of this proposed rule on small entities. The Coast Guard certifies under 5 U.S.C. 605(b) that this proposed rule would not have a significant economic impact on a substantial number of small entities. This rule would affect the following entities, some of which may be small entities: the owners or operators of vessels intending to enter or transit within the regulated areas during a vessel restriction period.
The RNA would not have a significant economic impact on a substantial number of small entities for the following reasons: vessel traffic would only be excluded from the RNA for limited durations (if at all), and speed and wake restrictions are not unduly restrictive, and the RNA covers a small geographic area. Additionally, before the effective period of a waterway closure, advanced public notifications would be made to local mariners through appropriate means, which could include, but would not be limited to, Local Notice to Mariners and Broadcast Notice to Mariners.
If you think that your business, organization, or governmental jurisdiction qualifies as a small entity and that this rule would have a significant economic impact on it, please submit a comment (see
ADDRESSES
) explaining why you think it qualifies and how and to what degree this rule would economically affect it.
3. Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this proposed rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the
FOR FURTHER INFORMATION CONTACT
, above. The Coast Guard will not retaliate against small entities that question or complain about this proposed rule or any policy or action of the Coast Guard.
4. Collection of Information
This proposed rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520.).
5. Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this proposed rule under that Order and determined that this rule does not have implications for federalism.
6. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the
FOR FURTHER INFORMATION CONTACT
section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.
7. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or
( printed page 54498)
more in any one year. Though this proposed rule would not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
8. Taking of Private Property
This proposed rule would not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
9. Civil Justice Reform
This proposed rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
10. Protection of Children From Environmental Health Risks
We have analyzed this proposed rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that might disproportionately affect children.
11. Indian Tribal Governments
This proposed rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
12. Energy Effects
This proposed rule is not a “significant energy action” under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
13. Technical Standards
This proposed rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.
14. Environment
We have analyzed this proposed rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have made a preliminary determination that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This proposed rule involves restricting vessel movement within a regulated navigation area. This rule is categorically excluded from further review under paragraph 34(g) of Figure 2-1 of the Commandant Instruction. A preliminary environmental analysis checklist supporting this determination is available in the docket where indicated under
ADDRESSES
. We seek any comments or information that may lead to the discovery of a significant environmental impact from this proposed rule.
Regulated Navigation Area: Thames River, New London, CT.
(a)
Location.
The following area is a regulated navigation area: All navigable waters of the Thames River adjacent to Fort Trumbull State Park in New London, CT, from surface to bottom bounded to the north by a line connecting the following points: Point “1”, 41°20′40″ N, 072°05′32″ W east to point “2”, 41°20′40″ N, 072°05′15″ W then southeast to point “3”, 41°20′31.8″ N, 072°05′03″ W then south to point “4”, 41°20′28″ N, 072°05′03″ W then east to point “5”, 41°20′30″ N, 072°04′48″ W; bounded to the east by following the shoreline south from point “5” to point “6”, 41°20′19″ N, 072°04′46″ W; bounded to the south by a line connecting the following points: point “6” west to point “7”, 41°20′17″ N, 072°05′13″ W then north to point “8” 41°20′27.2″ N, 072°05′15″ W then northwest to point “9” 41°20′29.5″ N, 072°05′17″ W then west to point “10” 41°20′29.5″ N, 072°05′30″ W then northwest to point “11” 41°20′31″ N, 072°05′34″ W; bounded to the west by following the shoreline north from point “11” back to the start, point “1”.
(2) In accordance with the general regulations, entry into, anchoring, or movement within this zone, during periods of enforcement, is prohibited unless authorized by the Captain of the Port Long Island Sound (COTP) or the COTP's designated representative.
(3) During periods of enforcement, a speed limit of five knots will be in effect within the regulated area and all vessels must proceed through the area with caution and operate in such a manner as to produce no wake.
(4) During periods of enforcement, all persons and vessels must comply with all orders and directions from the COTP or the COTP's designated representative.
(5) During periods of enforcement, upon being hailed by a U.S. Coast Guard vessel by siren, radio, flashing light or other means, the operator of the vessel must proceed as directed.
(6) Persons and vessels may request permission to enter the zone during periods of enforcement on VHF-16 or via phone at 203-468-4401.
(7) Notwithstanding anything contained in this rule, the Rules of the Road (33 CFR part 84—Subchapter E, inland navigational rules) are still in effect and should be strictly adhered to at all times.
(c)
Effective Period.
This rule is effective from November 1, 2012 until October 31, 2014.
(d)
Enforcement Period.
(1) Except when suspended in accordance with paragraph (d)(2) of this section, this regulated navigation area is in force 24 hours a day from November 1, 2012 until October 31, 2014.
(2) Notice of suspension of enforcement: The COTP may suspend enforcement of the regulated navigation area. If enforcement is suspended, the COTP will cause notice of the suspension of enforcement to be made by all appropriate means to the affected segments of the public. Such means of notification may include, but are not limited to, Broadcast Notice to Mariners
( printed page 54499)
and Local Notice to Mariners. Such notifications will include the date and time that enforcement is suspended as well as the date and time that enforcement will resume.
(3) Violations of this regulated navigation area should be reported to the COTP, at 203-468-4401 or on VHF-Channel 16. Persons in violation of this regulated navigation area may be subject to civil or criminal penalties.
Dated: August 22, 2012.
D.B. Abel,
Rear Admiral, U.S. Coast Guard, Commander, First Coast Guard District.