This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Approval and Promulgation of Air Quality Implementation Plans; Illinois; Infrastructure SIP Requirements for the 2006 PM2.5 NAAQS; Revisions to FIPs To Reduce Interstate Transport of PM2.5 and Ozone; Correction
This correcting amendment is effective on December 20, 2012.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Approval and Promulgation of Air Quality Implementation Plans; Illinois; Infrastructure SIP Requirements for the 2006 PM2.5 NAAQS; Revisions to FIPs To Reduce Interstate Transport of PM2.5 and Ozone; Correction
Approval and Promulgation of Air Quality Implementation Plans; Illinois; Infrastructure SIP Requirements for the 2006 PM2.5 NAAQS; Revisions to FIPs To Reduce Interstate Transport of PM2.5 and Ozone; Correction
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
55
as of
10/09/2026 at 8:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2012-30533 as it appeared on Public Inspection on
12/19/2012 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2012-30533 (77 FR 75383)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule; correcting amendment.
SUMMARY:
This document corrects errors in the codification of final rules published on July 13, 2011, August 8, 2011, February 21, 2012, and October 29, 2012. The July 13, 2011, and October 29, 2012, actions pertain to State Implementation Plan (SIP) submissions by Illinois regarding the infrastructure requirements of the Clean Air Act (CAA) for the 1997 eight-hour ground level ozone national ambient air quality standards (NAAQS), the 1997 fine particle (PM2.5) NAAQS, and the 2006 24-hour PM2.5
NAAQS. The August 8, 2011, and February 21, 2012, actions pertain to Federal Implementation Plans (FIPs) to reduce interstate transport of PM2.5
and ozone.
DATES:
This correcting amendment is effective on December 20, 2012.
FOR FURTHER INFORMATION CONTACT:
Christos Panos, Environmental Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, Region 5, Chicago, Illinois 60604, (312) 353-8328, or by email at
panos.christos@epa.gov.
SUPPLEMENTARY INFORMATION:
On August 8, 2011, (76 FR 48208), EPA published FIPs to reduce interstate transport of PM2.5
and ozone. It codified the regulation, “Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?”, at 40 CFR 52.745. In so doing, EPA had not realized that this section had already been reserved by a previous rulemaking action, titled “Section 110(a)(2) Infrastructure Requirements,” and created on July 13, 2011, (76 FR 41075). EPA attempted to correct this error on February 21, 2012, (77 FR 10324). What resulted, however, is that the interstate pollutant transport provision disappeared entirely.
We are now correcting this error by codifying the provision titled “Section 110(a)(2) Infrastructure Requirements” at 40 CFR 52.745; and codifying the provision titled “Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?” at 40 CFR 52.731. As a result of this correction, the rulemaking action published on October 29, 2012, (77 FR 65478) is now codified at 40 CFR 52.745.
Section 553 of the Administrative Procedure Act, 5 U.S.C. 553(b)(B), provides that, when an agency for good cause finds that notice and public procedure are impracticable, unnecessary or contrary to the public interest, the agency may issue a rule without providing notice and an opportunity for public comment. We have determined that there is good cause for making this rule final without prior proposal and opportunity for comment because we are merely correcting an incorrect citation in a previous action. Thus, notice and public procedure are unnecessary. We find that this constitutes good cause under 5 U.S.C. 553(b)(B).
Statutory and Executive Order Reviews
Under Executive Order (E.O.) 12866 (58 FR 51735, October 4, 1993), this action is not a “significant regulatory action” and is therefore not subject to review by the Office of Management and Budget. For this reason, this action is also not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355 (May 22, 2001)). Because the agency has made a “good cause” finding that this action is not subject to notice-and-comment requirements under the Administrative Procedures Act or any other statute as indicated in the Supplementary Information section above, it is not subject to the regulatory flexibility provisions of the Regulatory Flexibility Act (5 U.S.C 601 et seq), or to sections 202 and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In addition, this action does not significantly or uniquely affect small governments or impose a significant intergovernmental mandate, as described in sections 203 and 204 of UMRA. This rule also does not have a
( printed page 75384)
substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it have substantial direct effects on the States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various levels of governments, as specified by Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant.
This correction action does not involve technical standards; thus the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule also does not involve special consideration of environmental justice related issues as required by Executive Order 12898 (59 FR 7629, February 16, 1994). In issuing this rule, EPA has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct, as required by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996). EPA has complied with Executive Order 12630 (53 FR 8859, March 15, 1998) by examining the takings implications of the rule in accordance with the “Attorney General's Supplemental Guidelines for the Evaluation of Risk and Avoidance of Unanticipated Takings” issued under the executive order. This rule does not impose an information collection burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq).
The Congressional Review Act (5 U.S.C. 801 et seq.), as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 808 allows the issuing agency to make a rule effective sooner than otherwise provided by the CRA if the agency makes a good cause finding that notice and public procedure is impracticable, unnecessary or contrary to the public interest. This determination must be supported by a brief statement. 5 U.S.C. 808(2). As stated previously, EPA had made such a good cause finding, including the reasons therefore, and established an effective date of December 20, 2012. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the
Federal Register
. This correction to 40 CFR 52 for Illinois is not a “major rule” as defined by 5 U.S.C. 804(2).
Interstate pollutant transport provisions; What are the FIP requirements for decreases in emissions of nitrogen oxides?
(a)(1) The owner and operator of each source and each unit located in the State of Illinois and for which requirements are set forth under the TR NOX
Annual Trading Program in subpart AAAAA of part 97 of this chapter must comply with such requirements. The obligation to comply with such requirements will be eliminated by the promulgation of an approval by the Administrator of a revision to Illinois' State Implementation Plan (SIP) as correcting the SIP's deficiency that is the basis for the TR Federal Implementation Plan under § 52.38(a), except to the extent the Administrator's approval is partial or conditional.
(2) Notwithstanding the provisions of paragraph (a)(1) of this section, if, at the time of the approval of Illinois' SIP revision described in paragraph (a)(1) of this section, the Administrator has already started recording any allocations of TR NOX
Annual allowances under subpart AAAAA of part 97 of this chapter to units in the State for a control period in any year, the provisions of subpart AAAAA of part 97 of this chapter authorizing the Administrator to complete the allocation and recordation of TR NOX
Annual allowances to units in the State for each such control period shall continue to apply, unless provided otherwise by such approval of the State's SIP revision. (b)(1) The owner and operator of each source and each unit located in the State of Illinois and for which requirements are set forth under the TR NOX
Ozone Season Trading Program in subpart BBBBB of part 97 of this chapter must comply with such requirements. The obligation to comply with such requirements will be eliminated by the promulgation of an approval by the Administrator of a revision to Illinois' State Implementation Plan (SIP) as correcting the SIP's deficiency that is the basis for the TR Federal Implementation Plan under § 52.38(b), except to the extent the Administrator's approval is partial or conditional.
(2) Notwithstanding the provisions of paragraph (b)(1) of this section, if, at the time of the approval of Illinois' SIP revision described in paragraph (b)(1) of this section, the Administrator has already started recording any allocations of TR NOX
Ozone Season allowances under subpart BBBBB of part 97 of this chapter to units in the State for a control period in any year, the provisions of subpart BBBBB of part 97 of this chapter authorizing the Administrator to complete the allocation and recordation of TR NOX
Ozone Season allowances to units in the State for each such control period shall continue to apply, unless provided otherwise by such approval of the State's SIP revision.