Skip to Content

Notice

Zero Rate Reactive Power Rate Schedules; Notice Allowing Post-Workshop Comments

Document Details

Information about this document as published in the Federal Register.

Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

On December 11, 2013, a Commission staff-led workshop explored the mechanics of filing reactive power rate schedules for which there is no compensation.[1] Interested persons are invited to file written comments focused on the mechanics of filing reactive power rate schedules for which there is no compensation.

Comments should be filed with the Commission in this docket, Docket No. AD14-1-000, on or before 5:00 p.m. Eastern Time on January 24, 2014.

A link to the workshop webcast can be found here: http://stream.capitolconnection.org/​capcon/​ferc/​ferc.htm.

Start Signature

Dated: December 17, 2013.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

End Signature End Preamble

Footnotes

1.  The workshop was held in response to the Commission's directive in Chehalis Power Generating, L.P., Docket No. ER05-1056-007. Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013).

Back to Citation

[FR Doc. 2013-30547 Filed 12-23-13; 8:45 am]

BILLING CODE 6717-01-P