This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This deviation is effective from 7 a.m. on March 19, 2014 to 7 p.m. on April 15, 2014.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
39
as of
07/13/2026 at 8:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2014-03882 as it appeared on Public Inspection on
02/21/2014 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2014-03882 (79 FR 10012)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe Railway Bridge, also known as the St. Johns RR Bridge, across the Willamette River, mile 6.9, at Portland, OR. The deviation is necessary to facilitate replacement of the frayed counterweight wire ropes for the lift mechanism of the bridge. This deviation allows the bridge to remain in the closed position during maintenance activities.
( printed page 10013)
DATES:
This deviation is effective from 7 a.m. on March 19, 2014 to 7 p.m. on April 15, 2014.
ADDRESSES:
The docket for this deviation, [USCG-2014-0059] is available at
http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Coast Guard Thirteenth District; telephone 206-220-7282, email
steven.m.fischer3@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
Burlington Northern Santa Fe (BNSF) Railway requested this deviation to facilitate replacement of the frayed counterweight wire ropes for the lift mechanism of the bridge. The bridge, also known as the St. Johns RR Bridge, crosses the Willamette River at mile 6.9 and provides 54 feet of vertical clearance above Columbia River Datum 0.0, while in the closed position. Under normal operations this bridge opens on signal as required by 33 CFR 117.5. The deviation period is from 7 a.m. on March 19, 2014 to 7 p.m. on April 15, 2014. This deviation allows the lift span of the BNSF Railway Bridge across the Willamette River, mile 6.9, to remain in the closed position and need not open for maritime traffic during following four 12 hour periods: 7 a.m. to 7 p.m. on Wednesday, March 19, 2014; 7 a.m. to 7 p.m. on Monday, March 24, 2014; 7 a.m. to 7 p.m. on Thursday, March 27, 2014; and 7 a.m. to 7 p.m. on Tuesday, April 1, 2014. The bridge shall operate in accordance to 33 CFR 117.5 at all other times. BNSF will entertain requests from mariners to change the above listed schedule for emergent vessel arrivals or departures that are water level dependant given 72 hours advanced notice. BNSF contact is Ron Berry, who can be reached at (913) 551-4164. Waterway usage on this stretch of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft.
Vessels which do not require a bridge opening may continue to transit beneath the bridge during this closure period. Due to the nature of work being performed the draw span will be unable to open for for emergencies. Mariners have been notified and will be kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.