This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
47
as of
11/07/2026 at 2:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2014-10097 as it appeared on Public Inspection on
05/01/2014 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2014-10097 (79 FR 25156)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Environmental assessment and finding of no significant impact; final issuance.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of exemptions in response to an April 4, 2013, request from Dominion Energy Kewaunee (DEK, the licensee). One exemption would permit the licensee to use a portion of the funds from the Kewaunee Power Station (KPS) decommissioning trust fund (Trust) for irradiated fuel management activities. Another exemption would allow the licensee to make the withdrawals from the Trust for irradiated fuel management activities without prior notification to the NRC. The NRC staff is issuing an Environmental Assessment and Finding of No Significant Impact associated with the proposed exemptions.
ADDRESSES:
Please refer to Docket ID NRC-2013-0056 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this document using any of the following methods:
Federal rulemaking Web site: Go tohttp://www.regulations.gov
and search for Docket ID NRC-2013-0056. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; email:
Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the
FOR FURTHER INFORMATION CONTACT
section of this document.
NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection athttp://www.nrc.gov/reading-rm/adams.html. To begin the search, select “
ADAMS Public Documents
” and then select “
Begin Web-based ADAMS Search”. For problems with ADAMS, please contact the NRC's Public
( printed page 25157)
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to
pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced. The request for exemption, dated April 4, 2013, is available electronically under ADAMS Accession No. ML13098A031. The supplement, dated November 6, 2013, is available at ADAMS Accession No. ML13312A916.
NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
William Huffman, Office of Nuclear Reactor Regulation, 301-415-2046;
William.Huffman@nrc.gov;
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is considering issuance of exemptions from Part 50, Section 82(a)(8)(i)(A) and 10 CFR Part 50 Section 75(h)(1)(iv) of Title 10 of the
Code of Federal Regulations
(10 CFR) for Renewed Facility Operating License No. DPR-43, issued to Dominion Energy Kewaunee (DEK, the licensee), for the Kewaunee Power Station located in Kewaunee County, Wisconsin. The licensee requested the exemptions by letter dated April 4, 2013, and supplemented its request by letter dated November 6, 2013. The exemptions would allow the licensee to use a portion of the funds from the KPS Trust for irradiated fuel management activities without prior notification to the NRC. Consistent with 10 CFR 51.21, the NRC has reviewed the requirements in 10 CFR 51.20(b) and 10 CFR 51.22(c) and determined that an environmental assessment is the appropriate form of environmental review. Based on the results of the environmental assessment, which is provided in Section II below, the NRC is issuing this final finding of no significant impact.
II. Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt DEK from meeting the requirements set forth in 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv). The proposed action would allow DEK to use a portion of the funds from the Trust for irradiated fuel management without prior notification to the NRC.
The proposed action is in accordance with the licensee's application dated April 4, 2013, as supplemented by letter dated November 6, 2013.
The Need for the Proposed Action
By letter dated February 25, 2013, DEK informed the NRC of its intention to permanently cease operation of KPS on May 7, 2013 (ADAMS Accession No. ML13058A065). By separate letters dated February 26, 2013, DEK submitted an update to the KPS Irradiated Fuel Management Plan, as required by 10 CFR 50.54(bb), and a Post-Shutdown Decommissioning Activities Report (PSDAR), as required by 10 CFR 50.82(a)(4)(i) (ADAMS Accession Nos. ML13059A028 and ML13063A248, respectively). On May 7, 2013, DEK permanently ceased power operations at KPS. On May 14, 2013, DEK certified that it had permanently defueled the KPS reactor vessel (ADAMS Accession No. ML13135A209).
As required by 10 CFR 50.82(a)(8)(i)(A), decommissioning trust funds may be used by the licensee if the withdrawals are for legitimate decommissioning activity expenses, consistent with the definition of decommissioning in 10 CFR 50.2. The definition of “decommissioning” in 10 CFR 50.2 does not include activities associated with irradiated fuel management. Similarly, the requirements of 10 CFR 50.75(h)(1)(iv) restrict the use of decommissioning trust fund withdrawals (other than for ordinary and incidental expenses) to decommissioning expenses until final decommissioning is completed. Therefore, exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) are needed to allow DEK to use funds from the Trust for irradiated fuel management.
The licensee states that the Trust contains funds for decommissioning comingled with funds needed for irradiated fuel management not associated with radiological decontamination. The adequacy of the Trust to cover the costs of activities associated with irradiated fuel management and radiological decontamination through license termination is supported by the site specific decommissioning cost estimate in the PSDAR and the KPS updated Irradiated Fuel Management Plan. The licensee needs access to the funds in excess of those needed for radiological decontamination to support irradiated fuel management not associated with radiological decontamination.
The requirements of 10 CFR 50.75(h)(1)(iv) further provide that, except for decommissioning withdrawals being made under 10 CFR 50.82(a)(8) or for payment of ordinary and incidental expenses, no disbursement may be made from the Trust without written notice to the NRC at least 30 working days in advance. Therefore an exemption from 10 CFR 50.75(h)(1)(iv) is needed to allow DEK to use funds from the Trust for irradiated fuel management without prior NRC notification.
In summary, by letter dated April 4, 2013, as supplemented by letter dated November 6, 2013, DEK requested exemptions to allow Trust withdrawals, without prior written notification to the NRC, for irradiated fuel management consistent with both the KPS updated Irradiated Fuel Management Plan and the PSDAR.
Environmental Impacts of the Proposed Action
The proposed action involves exemptions from requirements that are of a financial or administrative nature which do not have an impact on the environment. The NRC has completed its evaluation of the proposed action and concludes that there is reasonable assurance that adequate funds are available in the Trust to complete all activities associated with license termination and irradiated fuel management. There is no decrease in the safety associated with the Trust being used to fund activities associated with irradiated fuel management. The exemptions would permit the use of Trust funds to effectuate DEK's plan to manage irradiated fuel in accordance with the updated Irradiated Fuel Management Plan and PSDAR. Since the exemption would allow DEK to use funds from the Trust that are in excess of those required for radiological decontamination of the site and the funds dedicated for radiological decontamination are not affected by the proposed exemption, there is reasonable assurance that there will be no environmental impact due to lack of adequate funding for decommissioning.
The proposed action will not significantly increase the probability or consequences of accidents. No changes are being made in the types of effluents that may be released offsite. There is no significant increase in the amount of any effluent released offsite. There is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential non-radiological impacts, the proposed action does not have any foreseeable impacts to land, air, or water resources,
( printed page 25158)
including impacts to biota. In addition, there are also no known socioeconomic or environmental justice impacts associated with such proposed action. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the “no-action” alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
Alternative Use of Resources
The action does not involve the use of any different resources than those previously considered in the Final Environmental Statement for the KPS, dated December 1972, and the “Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Kewaunee Power Station, Final Report,” NUREG-1437, Supplement 40, dated August 2010 (ADAMS Accession No. ML102150106).
Agencies or Persons Consulted
The staff did not enter into consultation with any other Federal Agency or with the State of Wisconsin regarding the environmental impact of the proposed action. On April 10, 2014, the Wisconsin state representative was notified.
III. Finding of No Significant Impact
The licensee has proposed exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) which would allow DEK to use funds from the Trust for irradiated fuel management activities in accordance with the updated Irradiated Fuel Management Plan and PSDAR, without prior written notification to the NRC.
The NRC decided not to prepare an Environmental Impact Statement for the proposed action. On the basis of the environmental assessment included in Section II above and incorporated by reference in this finding, the NRC concludes that the proposed action will not have significant effects on the quality of the human environment. Accordingly, the NRC has determined that a finding of no significant impact is appropriate.
Other than the licensee's letters, dated April 4, 2013, as supplemented by letter dated November 6, 2013, there are no other environmental documents associated with this review. These documents are available for public inspection as indicated above.
Dated at Rockville, Maryland, this 25th day of April 2014.
For the Nuclear Regulatory Commission.
Douglas A. Broaddus,
Chief, Plant Licensing IV-2 and Decommissioning Transition Branch, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.